Scrumban Standard Operations Guide
1. Overview
Scrumban is a hybrid process that combines the structure of Scrum with the flexible flow management of Kanban.
- Rules, roles, and backlog management provided by Scrum
- WIP limits, pull systems, and flow visualization provided by Kanban Combining these two enables teams to adapt rapidly to change and optimize workflow.
Core Philosophy "Stop starting, start finishing" — Finish work already in progress rather than starting new work.
2. Core Principles
- Pull-Based Work
- Work is started only when the team has the capacity to handle it.
- Forcefully "pushing" work into the pipeline disrupts the flow.
- WIP (Work In Progress) Limits
- Limit the number of items in progress concurrently to prevent quality degradation and multitasking overhead.
- Example: For a 5-person team,
Doing WIP = 3.
- Workflow Visualization
- Make every work item's status visible at a glance on a Kanban board.
- Bottlenecks can be identified immediately.
- Explicit Policies
- Document the entry/exit criteria for moving items into each column (such as Definition of Ready and Definition of Done) and share them across the entire team.
- Data-Driven Improvement
- Measure Cycle Time, Throughput, WIP, and CFD (Cumulative Flow Diagram) to guide process improvements.
3. Roles and Responsibilities
| Role | Primary Responsibilities | Notes |
|---|---|---|
| Product Owner (PO) | Backlog management, prioritization, requirement clarification, communicating business goals | Retained directly from Scrum |
| Flow Manager / Scrum Master | WIP monitoring, removing blockers, facilitating retrospectives, driving process improvement | Similar to Kanban's Service Delivery Manager role |
| Team Members (Dev, QA, etc.) | Adhering to WIP limits, pull-based execution, updating card statuses, ensuring quality | Requires autonomy and ownership |
| Stakeholders | Providing feedback, participating in demos and reviews | Regular engagement required |
4. Activities by Process Stage
| Stage | Activity | Detailed Description | Policy (Example) |
|---|---|---|---|
| Backlog | Request and idea intake | Starting point for all work, including customer requests, bugs, tech debt, and new features | Assign priority and Class of Service to every card |
| Ready | DoR verification, work prepared | Clarify requirements, secure resources, define test conditions | Move only after passing the DoR checklist |
| Doing | Work execution | Pull within WIP limit and carry out development/implementation | Doing WIP = 3 |
| Review | Code and document review | Verify quality, standards, security, and test coverage | Move to Testing upon reviewer approval |
| Testing | Quality verification | Automated and manual testing, defect resolution | Move to Done upon QA sign-off |
| Done | Work completion | Meet DoD, complete documentation/deployment, record Cycle Time | Apply completion tag |
5. Definition Criteria
5.1 Definition of Ready (DoR)
- Requirements are clear and documented
- Required designs and resources are secured
- Test conditions are defined
- Estimated scope and complexity are confirmed
5.2 Definition of Done (DoD)
- Code merged and build succeeds
- Automated and manual tests pass
- Documentation and release notes written
- Deployed (or delivered to the customer)
6. Meeting (Event) Operations Guide
| Meeting | Purpose | Cadence | Duration | Characteristics |
|---|---|---|---|---|
| Daily Stand-up | Share progress and blockers | Daily | 10–15 min | Discuss focused on column flow |
| Replenishment | Refill the Ready column | Weekly or at threshold | 30 min | Re-align priorities |
| Retrospective | Process improvement | Every 2–4 weeks | 30–60 min | Adjust WIP limits and policies |
| Service Delivery Review | Review SLA/SLE compliance | Monthly | 30 min | Metrics-driven review |
7. WIP Limit Operations
Initial value:
Team size ÷ 2Example WIP limits per column:
- Doing: 3
- Review: 2
- Testing: 2
If WIP exceeds the limit, immediately analyze the root cause (bottlenecks, staffing gaps, blockers, etc.)
Prohibit starting new work until the excess is resolved
8. Metrics Management
| Metric | Definition | Usage |
|---|---|---|
| Lead Time | Request created → Done | Analyze customer wait time |
| Cycle Time | Work started → Done | Measure flow stability |
| Throughput | Number of cards completed per period | Forecast productivity |
| Average WIP | Average number of items in progress | Prevent bottlenecks and multitasking |
| CFD | Cumulative item count per column | Identify bottleneck stages |
Tip: Applying Little's Law
WIP = Throughput × Cycle Time→ Adjusting any one of WIP, Throughput, or Cycle Time changes the others.
9. Sample Operating Rules
- Always check WIP limits before pulling work
- Assign a priority and owner to every card
- Flag blockers immediately (stickers or labels)
- Strictly timebox meetings (Stand-up ≤ 15 min)
- Apply process changes only after team consensus in a Retrospective
10. Process Visualization Example
[Backlog]
↓ (Replenishment)
[Ready]
↓ (Pull & WIP Check)
[Doing]
↓ (Development Complete)
[Review]
↓ (Review Approved)
[Testing]
↓ (QA Passed)
[Done]11. Improvement Cycle
- Collect metrics (Cycle Time, Throughput, WIP)
- Analyze bottlenecks and variability
- Adjust WIP limits, policies, and board structure
- Run a 1–2 week trial
- Validate impact in the Retrospective and finalize
12. Appendix
Sample Classes of Service
- Expedite: Immediate handling (urgent)
- Fixed Date: Hard deadline on a specific date
- Standard: Regular requests
- Intangible: Long-term value such as technical debt
Recommended Tools
- Jira, Trello, Azure DevOps, Miro, ClickUp
Key Takeaway Scrumban is a methodology focused on "keeping rules minimal while optimizing flow." The process must continuously evolve based on the team's data and consensus.