Scrumban Standard Operations Guide ​

1. Overview ​

Scrumban is a hybrid process that combines the structure of Scrum with the flexible flow management of Kanban.

  • Rules, roles, and backlog management provided by Scrum
  • WIP limits, pull systems, and flow visualization provided by Kanban Combining these two enables teams to adapt rapidly to change and optimize workflow.

Core Philosophy "Stop starting, start finishing" — Finish work already in progress rather than starting new work.


2. Core Principles ​

  1. Pull-Based Work
  • Work is started only when the team has the capacity to handle it.
  • Forcefully "pushing" work into the pipeline disrupts the flow.
  1. WIP (Work In Progress) Limits
  • Limit the number of items in progress concurrently to prevent quality degradation and multitasking overhead.
  • Example: For a 5-person team, Doing WIP = 3.
  1. Workflow Visualization
  • Make every work item's status visible at a glance on a Kanban board.
  • Bottlenecks can be identified immediately.
  1. Explicit Policies
  • Document the entry/exit criteria for moving items into each column (such as Definition of Ready and Definition of Done) and share them across the entire team.
  1. Data-Driven Improvement
  • Measure Cycle Time, Throughput, WIP, and CFD (Cumulative Flow Diagram) to guide process improvements.

3. Roles and Responsibilities ​

RolePrimary ResponsibilitiesNotes
Product Owner (PO)Backlog management, prioritization, requirement clarification, communicating business goalsRetained directly from Scrum
Flow Manager / Scrum MasterWIP monitoring, removing blockers, facilitating retrospectives, driving process improvementSimilar to Kanban's Service Delivery Manager role
Team Members (Dev, QA, etc.)Adhering to WIP limits, pull-based execution, updating card statuses, ensuring qualityRequires autonomy and ownership
StakeholdersProviding feedback, participating in demos and reviewsRegular engagement required

4. Activities by Process Stage ​

StageActivityDetailed DescriptionPolicy (Example)
BacklogRequest and idea intakeStarting point for all work, including customer requests, bugs, tech debt, and new featuresAssign priority and Class of Service to every card
ReadyDoR verification, work preparedClarify requirements, secure resources, define test conditionsMove only after passing the DoR checklist
DoingWork executionPull within WIP limit and carry out development/implementationDoing WIP = 3
ReviewCode and document reviewVerify quality, standards, security, and test coverageMove to Testing upon reviewer approval
TestingQuality verificationAutomated and manual testing, defect resolutionMove to Done upon QA sign-off
DoneWork completionMeet DoD, complete documentation/deployment, record Cycle TimeApply completion tag

5. Definition Criteria ​

5.1 Definition of Ready (DoR) ​

  • Requirements are clear and documented
  • Required designs and resources are secured
  • Test conditions are defined
  • Estimated scope and complexity are confirmed

5.2 Definition of Done (DoD) ​

  • Code merged and build succeeds
  • Automated and manual tests pass
  • Documentation and release notes written
  • Deployed (or delivered to the customer)

6. Meeting (Event) Operations Guide ​

MeetingPurposeCadenceDurationCharacteristics
Daily Stand-upShare progress and blockersDaily10–15 minDiscuss focused on column flow
ReplenishmentRefill the Ready columnWeekly or at threshold30 minRe-align priorities
RetrospectiveProcess improvementEvery 2–4 weeks30–60 minAdjust WIP limits and policies
Service Delivery ReviewReview SLA/SLE complianceMonthly30 minMetrics-driven review

7. WIP Limit Operations ​

  • Initial value: Team size ÷ 2

  • Example WIP limits per column:

    • Doing: 3
    • Review: 2
    • Testing: 2
  • If WIP exceeds the limit, immediately analyze the root cause (bottlenecks, staffing gaps, blockers, etc.)

  • Prohibit starting new work until the excess is resolved


8. Metrics Management ​

MetricDefinitionUsage
Lead TimeRequest created → DoneAnalyze customer wait time
Cycle TimeWork started → DoneMeasure flow stability
ThroughputNumber of cards completed per periodForecast productivity
Average WIPAverage number of items in progressPrevent bottlenecks and multitasking
CFDCumulative item count per columnIdentify bottleneck stages

Tip: Applying Little's Law WIP = Throughput × Cycle Time → Adjusting any one of WIP, Throughput, or Cycle Time changes the others.


9. Sample Operating Rules ​

  1. Always check WIP limits before pulling work
  2. Assign a priority and owner to every card
  3. Flag blockers immediately (stickers or labels)
  4. Strictly timebox meetings (Stand-up ≤ 15 min)
  5. Apply process changes only after team consensus in a Retrospective

10. Process Visualization Example ​

[Backlog]
  ↓ (Replenishment)
[Ready]
  ↓ (Pull & WIP Check)
[Doing]
  ↓ (Development Complete)
[Review]
  ↓ (Review Approved)
[Testing]
  ↓ (QA Passed)
[Done]

11. Improvement Cycle ​

  1. Collect metrics (Cycle Time, Throughput, WIP)
  2. Analyze bottlenecks and variability
  3. Adjust WIP limits, policies, and board structure
  4. Run a 1–2 week trial
  5. Validate impact in the Retrospective and finalize

12. Appendix ​

Sample Classes of Service ​

  • Expedite: Immediate handling (urgent)
  • Fixed Date: Hard deadline on a specific date
  • Standard: Regular requests
  • Intangible: Long-term value such as technical debt
  • Jira, Trello, Azure DevOps, Miro, ClickUp

Key Takeaway Scrumban is a methodology focused on "keeping rules minimal while optimizing flow." The process must continuously evolve based on the team's data and consensus.