Skip to content

Empasy Business & Project Management Standard Document Templates Download Center (125 Templates) ​

This center provides 125 deduplicated single-standard blank templates (Clean Blank Master), 121 real-world filled examples (SyncFlow AI Sample), and 14 synchronized Markdown (Quick Copy) templates side by side across the entire lifecycle of Empasy Business & Development Methodology v2.0 (Phase 0 Pre-sales through Phase 5 Go-Live & Settlement + C0 Common & Legal).

All Office templates are uniformly standardized under the Empasy 90-8-2 Restrained Consulting Design Standard (90% pure white and neutral gray, 8% Deep Executive Navy #0F2547, 2% Muted Gold #B08D4E, single Malgun Gothic typeface, Word ISO A4 with headers and footers, Excel freeze panes, A4 print layout, and automated formulas, and PPT 16:9 widescreen), making them immediately ready for monochrome printing and third-party audits across public, financial, and enterprise engagements.


1. Tailoring Preset Bulk Downloads by Project Scale (Templates + Examples Included) ​

Select a package tailored to your project scale and profile for one-click download. Preset ZIPs 1 through 5 package the Blank Master folder and the SyncFlow AI Sample folder separately so practitioners can reference filled examples while immediately editing blank templates.

PackageIncluded CountFile SizeComposition & Recommended UseDownload
Enterprise Standard Integrated Master Pack (Full Public / Audit-Ready)125 templates + 121 examples18.4 MBAll-in-one pack for public, financial, and enterprise third-party audits — includes all 125 blank templates (including 14 MD files) + 121 SyncFlow AI filled examplesZIP (18.4 MB)
Small / MVP Essential Pack (Small Tailoring)29 templates + 27 examples3.4 MBCore set for projects under KRW 100M / 2–3 month short-term builds — includes 29 blank templates (including MD) + 27 corresponding filled examplesZIP (3.4 MB)
Standard Enterprise Pack (Medium Tailoring)88 templates + 85 examples13.3 MBStandard SI delivery set for KRW 100M–500M / 4–6 month enterprise builds — includes 88 blank templates (including MD) + 85 corresponding filled examplesZIP (13.3 MB)
AI / LLM Project Specialized Pack (AI Add-on)10 templates + 8 examples1.0 MB2026 AI Basic Act governance, inference/prompts, golden datasets, and FinOps — includes 10 AI-specialized blank templates + 8 corresponding filled examplesZIP (1.0 MB)
Legal, Contract, Subcontracting & Crisis Pack (Legal & Operations)18 templates + 18 examples1.1 MBDedicated pack for Legal & Management Support (NDA, contracts, advance payment, subcontracting, outsourcing, crisis response) — includes 18 blank templates (including MD) + 18 corresponding filled examplesZIP (1.1 MB)
Filled Examples Reference Pack (SyncFlow AI Sample Reference Pack)121 examples8.8 MBDedicated to onboarding new PMs/planners and audit reference — standalone pack of all 121 real-world filled examples for the fictional engagement (Hanbit Global Co., Ltd. SyncFlow AI)ZIP (8.8 MB)

Two-Track Simultaneous Delivery Principle (Blank Master + Filled Sample)

  • Blank Templates (Blank Master, 125 files): Organized with consistent placeholders such as Client Name, Project Name, and Contract No. for immediate deployment to active client engagements.
  • Filled Examples (SyncFlow AI Sample, 121 files): Reference copies populated with realistic project data based on a fictional client (Hanbit Global Co., Ltd.) and fictional engagement (SyncFlow AI). You can also download the blank template and filled example side by side in every catalog row below.

All deliverables are managed under the EMP-{Phase}-{Seq} single code system. Check each row's Tailoring badge (S Small/MVP, M Standard Enterprise, L Public/Large Audit, AI AI-Specialized, Legal Management Support & Legal) and download both the Blank Template and Filled Example.

Common Governance & Training Masters (Governance & Guide) (6 Templates) ​

Initial project environment setup, Tailoring matrix by scale, integrated management master, and PM Practice Guide v2.0

Doc CodeDocument TitleOwner RoleApplicable ScalePurpose & Key ContentsBlank TemplateFilled Example (Sample)
EMP-G0-01Standard Project Deliverable Folder StructurePMO / PMS · M · LStandard directory template mapped 1:1 to Phase 0–5 and C0 methodology for immediate kickoff deploymentZIP (7 KB)Common Guide
EMP-G0-02Project Methodology Tailoring MatrixPMO / PMM · LMaster matrix defining Mandatory (M) vs. Optional (O) deliverable applicability and owners by project scale (L/M/S)Excel (23 KB)Sample Excel (23 KB)
EMP-G0-03Project Integrated Management Master (7 Linked Sheets)Lead PMS · M · LSingle management master linking dashboard, milestones, deliverables, staffing, meeting minutes, issues/risks, and quality checks via formulasExcel (19 KB)Sample Excel (20 KB)
EMP-G0-04Project Management (PMBOK) Standard GlossaryPMO / All RolesLComprehensive glossary of core PMBOK and software engineering terms and acronymsExcel (73 KB)Common Guide
EMP-G0-05PEmpasy Project Management Practice Guide v2.0 (Lecture Slides)All-Role TrainingM · L · AIOfficial training deck covering the 2026 AI-Native business & PM lifecycle (Phase 0–5, 4 Sign-offs, AI Basic Act, FinOps, subcontracting & crisis response)PPT (276 KB)Common Guide
EMP-G0-05DEmpasy Project Management Practice Guide v2.0 (Handout PDF)All-Role TrainingS · M · L · AIHigh-resolution vector PDF handout of the Empasy Project Management Practice Guide v2.0 for printing and distributionPDF (548 KB)Common Guide

Phase 0. Pre-Sales & Proposal Phase (Pre-sales) (11 Templates) ​

Preventing unprofitable bids (Go/No-Go), 3-year TCO costing & estimation, technical proposals, PT defense, and pre-bid technical sign-off

Doc CodeDocument TitleOwner RoleApplicable ScalePurpose & Key ContentsBlank TemplateFilled Example (Sample)
EMP-P0-01Mutual Non-Disclosure Agreement (NDA)Sales / LegalS · M · L · LegalMutual trade-secret protection prior to RFP analysis, prohibition on training external general-purpose AI/LLM models, and 3-year confidentiality covenantWord (36 KB)
MD (3 KB)
Sample Word (36 KB)
EMP-P0-02Bid Feasibility Review Sheet (Go/No-Go)Sales / Tech LeadS · M · LQuantitative review across 5 metrics—technology, profitability, schedule, reuse rate, and risk (Go decision at 70+ points)Excel (9 KB)
MD (1 KB)
Sample Excel (9 KB)
EMP-P0-03Pre-Sales Client Discovery QuestionnairePresales / PMM · LPre-visit Q&A checklist capturing business environment, integration targets, constraints, and requirementsExcel (8 KB)Sample Excel (8 KB)
EMP-P0-043-Year TCO Cost Calculation SheetSales / PMM · L · AIIntegrated 3-year total cost of ownership sheet covering development labor, GPU/cloud infrastructure, and commercial LLM API token costsExcel (7 KB)Sample Excel (7 KB)
EMP-P0-05Project Award Execution Budget SheetSales / Project OpsM · LPost-award cost and target margin control sheet by line item (labor, direct expenses, subcontracting, contingency reserve)Excel (7 KB)Sample Excel (7 KB)
EMP-P0-06SW Development Official Standard QuotationSales / FinanceS · M · LOfficial quotation cover sheet and breakdown based on person-months (M/M) and SW project pricing standardsExcel (7 KB)Sample Excel (7 KB)
EMP-P0-07Proposal Work Breakdown PlanProposal PMLAuthor assignment by proposal section, review schedule, and submission checklistExcel (7 KB)Sample Excel (7 KB)
EMP-P0-08Preliminary Technical Proposal BriefProposal PM / AAM · L · AIPre-proposal brief presenting client requirement analysis, target AI/cloud architecture, and technical directionWord (36 KB)Sample Word (36 KB)
EMP-P0-09Project Technical Proposal Standard TemplateProposal PM / ArchitectS · M · LProposal deck covering business understanding, target 4-tier architecture, requirement fulfillment, delivery methodology, quality/security, staffing, and warranty supportPPT (230 KB)Sample PPT (230 KB)
EMP-P0-10Proposal Presentation (PT) & Evaluator Q&A Defense DeckProposal PM / SalesM · LPresentation deck featuring 4 key differentiators, pre-PoC validation results, and 3-tier defense slides for top 10 evaluator challenge questionsPPT (218 KB)Sample PPT (218 KB)
EMP-P0-11Technical Feasibility Pre-Approval (Technical Sign-off)Tech LeadM · LInternal control form signed by the Development Lead prior to bidding to confirm technical feasibility, effort estimates, and schedule adequacyWord (36 KB)Sample Word (36 KB)

Phase 1. Initiation & Requirements Analysis Phase (Inception & SRS) (22 Templates) ​

Main contract, kickoff notice, advance payment (30–50%), master WBS, SRS/RTM, AI governance review, and Scope Freeze (Sign-off #1)

Doc CodeDocument TitleOwner RoleApplicable ScalePurpose & Key ContentsBlank TemplateFilled Example (Sample)
EMP-P1-01Standard Software Service AgreementLegal / SalesS · M · L · LegalStandard contract covering payment terms (30% advance, 40% interim, 30% final), 0.075% liquidated damages, IP ownership, and defect warrantyWord (36 KB)Sample Word (36 KB)
EMP-P1-02Kickoff Notice & Project Management Plan (PMP)Lead PMS · M · LIntegrated PMP covering official kickoff filing, execution strategy, org chart & staffing, master schedule, quality/security/AI governance, and change controlWord (39 KB)Sample Word (39 KB)
EMP-P1-03Project Management Plan Presentation Deck (PMP Deck)PM / ArchitectLPMP presentation slides for executive and client kickoff reviewPPT (379 KB)Sample PPT (379 KB)
EMP-P1-04Official Kickoff Briefing PresentationLead PMM · LBriefing deck for client executives and business stakeholders covering the roadmap, delivery governance, deliverable plan, and support requestsPPT (241 KB)Sample PPT (177 KB)
EMP-P1-05Kickoff Workshop PlanPMLAgenda, participant R&R, and preparation checklist for the joint client-vendor kickoff workshopExcel (7 KB)Sample Excel (7 KB)
EMP-P1-06Advance Payment Request & Utilization PlanManagement Support / PMM · L · LegalStandard form for early billing of 30–50% advance payment, itemized usage plan, and advance payment surety bond attachmentWord (36 KB)
MD (1 KB)
Sample Word (36 KB)
EMP-P1-07SW Project Subcontracting Pre-Approval ApplicationPM / Management SupportL · LegalApplication complying with Article 51 of the Software Promotion Act, capping subcontracting under 50% and prohibiting re-subcontractingWord (36 KB)
MD (1 KB)
Sample Word (36 KB)
EMP-P1-08Staff Security Pledge & Personal Data Processing Entrustment AgreementSecurity / LegalS · M · L · LegalSource-code exfiltration prohibition pledge for all assigned staff and PIPA-compliant personal data processing entrustment contractWord (36 KB)Sample Word (36 KB)
EMP-P1-09Project Contact Directory & Cadence MatrixPMO / PMM · LEmergency contact directory across client, prime, and partners, R&R, and regular reporting/collaboration channel definitionsExcel (10 KB)Sample Excel (10 KB)
EMP-P1-10Work Breakdown Structure (WBS Master)Lead PMS · M · LPhase 0–5 full-lifecycle WBS with weight-based automated planned/actual progress calculation (SUMPRODUCT) and holiday calendarExcel (14 KB)Sample Excel (14 KB)
EMP-P1-11Executive Milestone Summary TimelineLead PMM · LSummary deck highlighting key milestone dates, the 4 major Sign-off gates, and decision checkpointsPPT (157 KB)Sample PPT (157 KB)
EMP-P1-12Scope of Work Confirmation & Deliverable ListPM / BAM · LIntegrated 2-sheet tracker for in-scope/out-of-scope boundaries, assumptions, and official phase deliverablesExcel (10 KB)Sample Excel (10 KB)
EMP-P1-13Software Requirements Specification (SRS)Planner / BAS · M · L4-sheet detailed specification covering Functional (SFR), Data (DAR), Interface (SIR), Security (SER), and Quality (QUR) requirementsExcel (103 KB)Sample Excel (103 KB)
EMP-P1-14Requirements Traceability Matrix (RTM)BA / QAS · M · L3-sheet bidirectional traceability matrix linking Requirement ID <-> Screen Design <-> DB Table <-> Test CaseExcel (88 KB)Sample Excel (88 KB)
EMP-P1-15Business Requirements Questionnaire & Content Supply ListPlanner / BAL2-sheet tracker for stakeholder interview Q&A and client-supplied data, images, and documentsExcel (9 KB)Sample Excel (9 KB)
EMP-P1-16Target System Environment Analysis ReportArchitect / InfraLDetailed analysis report of the client's existing IT infrastructure, servers, DBMS, network, and integration environmentWord (128 KB)Sample Word (127 KB)
EMP-P1-17Benchmarking Analysis ReportPlanner / BALComparison matrix of domestic and global AI/enterprise solutions and TO-BE design implicationsPPT (143 KB)Sample PPT (143 KB)
EMP-P1-18AS-IS Current Process DefinitionPlanner / BAM · LCurrent business workflow diagrams, bottleneck (pain-point) diagnosis, and automation candidate identificationPPT (142 KB)Sample PPT (142 KB)
EMP-P1-19Internal/External Interface Specification Pre-AgreementArchitect / Interface PLM · L4-sheet agreement pre-confirming integration methods, frequency, security, and SLA with legacy system owners (SSO, portal, DB)Excel (12 KB)Sample Excel (12 KB)
EMP-P1-20Scope of Work Freeze Agreement (Sign-off #1)PM / Business LeadS · M · LSRS v1.0 scope freeze, invalidation of verbal requests, CR linkage for changes exceeding 3 M/D, and Phase 2 gate approvalWord (36 KB)
MD (2 KB)
Sample Word (36 KB)
EMP-P1-21Assigned Staff Replacement Approval RequestPM / Project OpsL · LegalSW Promotion Act-compliant request for replacing departing staff with KOSA-equivalent or higher personnel and 5-business-day joint handoverWord (36 KB)Sample Word (36 KB)
EMP-P1-22AI Governance & AI Basic Act Trustworthiness ChecklistAI Lead / Security / LegalM · L · AIAutomated 18-item evaluation covering 2026 AI Basic Act high-impact AI classification, generation disclosure, PII masking, external training exclusion, and HITL gatesExcel (12 KB)Sample Excel (12 KB)

Phase 2. Spec-First Architecture & Detailed Design Phase (Design & Spec) (25 Templates) ​

Screen storyboard (Sign-off #2), SAD & firewall requests, 2026 development standards, data standardization & 9-sheet DB spec, API/batch & AI prompt design

Doc CodeDocument TitleOwner RoleApplicable ScalePurpose & Key ContentsBlank TemplateFilled Example (Sample)
EMP-P2-01Site & Menu Information Architecture (IA)UI/UX PlannerM · L4-sheet mapping of Depth 1–4 portal and back-office menu hierarchy, URL paths, screen IDs, and role permissionsExcel (98 KB)Sample Excel (98 KB)
EMP-P2-02Unit Function SpecificationPlanner / BAM · L3-sheet detailed specification of screen/module unit functions, input/processing/output logic, and exception rulesExcel (100 KB)Sample Excel (100 KB)
EMP-P2-03System Operations Policy DefinitionPlanner / BAM · L3-sheet specification defining business and system policies including permissions, security, data retention periods, and AI decision thresholdsExcel (90 KB)Sample Excel (90 KB)
EMP-P2-04TO-BE Target Process DefinitionBA / PlannerM · LTarget business workflows after system/AI adoption, inter-system sequences, and role allocationPPT (376 KB)Sample PPT (376 KB)
EMP-P2-05Screen Design Common Layout GuideUI/UX PlannerLCommon specifications for GNB/LNB/Footer regions, grids, shared popups, error messages, and interactionsPPT (122 KB)Sample PPT (122 KB)
EMP-P2-06Screen Design Detailed Storyboard (UI/UX)UI/UX PlannerS · M · LStandard template for per-screen wireframes and numbered-badge component functional descriptionsPPT (202 KB)Sample PPT (202 KB)
EMP-P2-07UI/UX Design Strategy & Visual GuideDesign TeamM · L90-8-2 color tokens, typography, Vben Admin component standards, and KWCAG 2.2 accessibility guidePPT (224 KB)Sample PPT (224 KB)
EMP-P2-08Copyrighted Image & Font Usage RegisterDesign TeamLLicense evidence and usage tracking register for fonts, icons, and stock images adopted in the projectExcel (7 KB)Sample Excel (7 KB)
EMP-P2-09Prototype Build Plan & Verification ReportPlanner / DesignLCombined plan for clickable prototype scope and test scenarios plus business feedback incorporation reportWord (38 KB)Sample Word (38 KB)
EMP-P2-10UI Screen Design Approval Certificate (Sign-off #2)UI/UX / BusinessS · M · LOfficial sign-off confirming the final screen count per menu and layout freeze (Design Freeze)Word (36 KB)
MD (1 KB)
Sample Word (36 KB)
EMP-P2-11System Architecture Definition (SAD)Architect (AA)S · M · LDetailed specification of logical/physical servers, containers (EKS/Docker), network segmentation, and security architectureWord (38 KB)Sample Word (38 KB)
EMP-P2-12System Architecture Diagram SlidesArchitect (AA)M · LDiagrams covering DEV/STG/PRD 3-tier isolation, internal/external ALB segmentation, and hybrid RAG architecturePPT (503 KB)Sample PPT (503 KB)
EMP-P2-13Cloud Infrastructure & Firewall Port RequestInfra / AAM · L8-sheet request for DEV/STG/PRD cloud server sizing, firewall port matrices, and account provisioningExcel (533 KB)Sample Excel (543 KB)
EMP-P2-14Cloud Infrastructure Provisioning Request DiagramInfra / AALSlide deck requesting cloud resources and firewall policies for submission to client infrastructure/security teamsPPT (475 KB)Sample PPT (475 KB)
EMP-P2-15Development Standards & Environment Definition (2026 Standard)Tech Lead / DevOpsM · LEnterprise standards for Java 25, Spring Boot 4.0, AgentScope, Lombok, PostgreSQL 18.6 6-File, Vue 3 Vben, and Zero-MockWord (38 KB)Sample Word (38 KB)
EMP-P2-16Software Component Design SpecificationBackend / FrontendLClass structures, method signatures, transaction boundaries, and exception handling specifications for core business modulesWord (36 KB)Sample Word (36 KB)
EMP-P2-17Data Standard Terminology Definition (Audit Mandatory)Data Architect (DA)M · L5-sheet integrated data standardization specification covering Domain, Standard Word, and Standard Term dictionariesExcel (16 KB)Sample Excel (16 KB)
EMP-P2-18Common Code & Numbering Rule Specification (Audit Mandatory)Data Architect (DA)M · L5-sheet specification for common code groups, detail codes, session variables, and business ID numbering rulesExcel (99 KB)Sample Excel (99 KB)
EMP-P2-19Logical & Physical Data Model Design SpecificationDA / DBAM · LIntegrated specification of logical ERD normalization by subject area and PostgreSQL 18.6 + pgvector HNSW/partitioning physical designWord (38 KB)Sample Word (38 KB)
EMP-P2-20Database Specification (9-Sheet Integrated · Audit Mandatory)DBA / BackendS · M · L9-sheet integrated DB schema specification covering Tables, Indexes, Views, Procedures, Functions, Triggers, and SequencesExcel (113 KB)Sample Excel (112 KB)
EMP-P2-21Process x Entity CRUD Matrix (Audit Mandatory)DBA / Tech LeadLCorrelation matrix mapping unit processes (screens, APIs, batches) against DB table Create/Read/Update/Delete operationsExcel (85 KB)Sample Excel (85 KB)
EMP-P2-22Interface & REST API Specification (6 Sheets)Backend PLS · M · L6-sheet design specification covering Canonical URLs (/api/v1/...), internal/external interface inventory, connection details, and payload field mappingsExcel (129 KB)Sample Excel (129 KB)
EMP-P2-23Batch Program Design Specification (Audit Mandatory)Backend PLLDesign specification for scheduled batch jobs, upstream/downstream dependencies, timeouts, and failure recoveryExcel (87 KB)Sample Excel (87 KB)
EMP-P2-24AI Inference Pipeline & Prompt Design SpecificationAI Engineer / AAM · L · AIDesign specification for multimodal preprocessing -> hybrid RAG -> AgentScope inference pipeline and structured outputsWord (37 KB)Sample Word (37 KB)
EMP-P2-25Module-Level Detailed Development ScheduleTech Lead / PMLPost-design developer assignment by unit feature/sprint and daily progress tracking scheduleExcel (7 KB)Sample Excel (7 KB)

Phase 3. AI-Collaborative Implementation & Progress/Change Control Phase (Implementation & Control) (17 Templates) ​

Weekly, monthly, and interim progress reports (3 separate templates), meeting minutes, effort/cost tracking, issues/risks/defects, 3 M/D change control (CR), interim acceptance, and Extension of Time (EOT)

Doc CodeDocument TitleOwner RoleApplicable ScalePurpose & Key ContentsBlank TemplateFilled Example (Sample)
EMP-P3-01Weekly Progress ReportLead PMS · M · LStandard weekly report tracking this week's accomplishments, next week's plan, planned vs. actual progress, and key issuesExcel (7 KB)Sample Excel (7 KB)
EMP-P3-02Monthly Progress Report (Executive Briefing)Lead PMM · LMonthly executive deck covering S-Curve progress, phase status, monthly actuals/plans, risk/CR status, and effort burnPPT (220 KB)Sample PPT (220 KB)
EMP-P3-03Interim Report Presentation (Interim Payment Gate)Lead PMM · LPresentation deck for 40% interim payment inspection and interim audit covering design completion, live demo, and second-half strategyPPT (217 KB)Sample PPT (217 KB)
EMP-P3-04Official Meeting Minutes 3-Type PackagePMO / PMM · LIntegrated package of 3 official meeting templates: Kickoff, Infrastructure/Architecture Review, and Weekly StatusWord (39 KB)Sample Word (39 KB)
EMP-P3-05Integrated Meeting Minutes & Action Item RegisterPMO / PMLMaster Excel log tracking all meeting agendas, decisions, and follow-up action item closureExcel (7 KB)Sample Excel (7 KB)
EMP-P3-06Monthly Effort (M/M) & Assigned Staff ProfilePM / Project OpsM · LIntegrated tracker for monthly planned vs. actual M/M by role alongside staff career and technical grade profilesExcel (25 KB)Sample Excel (25 KB)
EMP-P3-07Project Cost Execution Control LedgerPM / Project OpsM · LTracker monitoring monthly actual costs (labor, cloud, subcontracting) and collections against contract budgetExcel (7 KB)Sample Excel (7 KB)
EMP-P3-08Integrated Issue & Risk RegisterPM / Tech LeadS · M · L3-sheet register combining active issue tracking with potential risk mitigation plansExcel (14 KB)Sample Excel (14 KB)
EMP-P3-09Daily Check & Integrated Defect Tracking RegisterQA / PMOM · L4-sheet register for screen/feature daily checks, defect severity classification, and fix/retest trackingExcel (106 KB)Sample Excel (106 KB)
EMP-P3-10Change Request (CR Form)PM / Business RequesterS · M · LAgreement documenting As-Is vs. To-Be specs, quantitative DB/API/UI impact, and effort/schedule adjustments over 3 M/DWord (36 KB)
MD (1 KB)
Sample Word (36 KB)
EMP-P3-11Requirements & Design Change Cumulative RegisterPMO / PMM · LCumulative register tracking all submitted CRs, approval status, scope swaps, and effort deltasExcel (8 KB)Sample Excel (8 KB)
EMP-P3-12Interim Payment Inspection RequestPM / SalesM · L · LegalFormal application with interim milestone evidence requesting inspection for the 40% interim progress paymentWord (36 KB)Sample Word (36 KB)
EMP-P3-13Extension of Time Request & Excusable Delay Proof (EOT)PM / LegalL · LegalFormal claim proving client-attributed delays (firewall/data non-provision), liquidated damages waiver, and schedule extensionWord (36 KB)Sample Word (36 KB)
EMP-P3-14REST API Developer Integration ManualBackend PLLDeveloper manual covering authentication, common response envelopes, error codes, and API invocation for frontend and external integratorsWord (36 KB)Sample Word (36 KB)
EMP-P3-15AI Business Rule Dictionary SpecificationAI Engineer / BAL · AIMaster dictionary of domain compliance rulesets (prohibited, caution, and allowed regexes plus standard replacement phrasing)Excel (17 KB)Sample Excel (17 KB)
EMP-P3-16AI Prompt Specification & Version RegisterAI EngineerM · L · AIRegister of phase-by-phase system/user prompt templates, model parameters (Temperature/Top-P), and JSON output schemasExcel (10 KB)Sample Excel (10 KB)
EMP-P3-17Legacy Core System DB Integration Detail SpecificationBackend / Interface PLLDetailed implementation specification for client core DB view queries, daily batch sync schedules, and column mappingsExcel (8 KB)Sample Excel (8 KB)

Phase 4. Quality Verification, Security & Audit Phase (Verification & Audit) (11 Templates) ​

Unit and integration testing, MOIS & KISA 49 secure coding checks, OSS licenses, performance, AI golden-set evaluation, third-party audit, and UAT (Sign-off #3)

Doc CodeDocument TitleOwner RoleApplicable ScalePurpose & Key ContentsBlank TemplateFilled Example (Sample)
EMP-P4-01Unit Test PlanDev Lead / QALPlan defining JUnit 5 / Vitest unit test scope per module, isolation principles, and coverage pass criteriaWord (129 KB)Sample Word (128 KB)
EMP-P4-02Unit Test Cases & ResultsDev / QAM · L8-sheet unit test case specification recording inputs, expected results, actual results, and pass/fail verdicts per moduleExcel (109 KB)Sample Excel (109 KB)
EMP-P4-03Integration Test PlanQA LeadLPlan defining E2E system integration test schedule, environments, scenario structure, and defect resolution proceduresWord (129 KB)Sample Word (128 KB)
EMP-P4-04Integration Test Scenarios & ResultsQA EngineerS · M · L3-sheet evidence report documenting workflow-based E2E integration test steps, expected-value checks, and final pass recordsExcel (95 KB)Sample Excel (95 KB)
EMP-P4-05System Installation Plan (2026 Cloud/K8s)DevOps / InfraLInstallation, verification, and rollback plan for STG/PRD containers, PostgreSQL 18.6, Redis, and MinIOWord (37 KB)Sample Word (37 KB)
EMP-P4-06SW Secure Coding 49-Rule Checklist (MOIS & KISA)Security / Tech LeadM · LDiagnostic and remediation report covering all 49 secure coding weaknesses across 7 domains per MOIS and KISA guidelinesExcel (10 KB)Sample Excel (10 KB)
EMP-P4-07Open Source (OSS) License Verification & SBOMSecurity / Tech LeadM · LVerification table of adopted OSS inventory, Apache/MIT/BSD compliance, GPL contamination prevention, and NOTICE attributionExcel (7 KB)Sample Excel (7 KB)
EMP-P4-08Performance & Load Test Results ReportInfra / QAM · LSLA proof report measuring target virtual users (VU), TPS, mean/P95 response times, and resource utilizationExcel (8 KB)Sample Excel (8 KB)
EMP-P4-09AI Golden-Set Quantitative Quality Evaluation ReportAI Engineer / QAM · L · AI1:1 comparison of AI outputs against a 50-question domain ground-truth dataset evaluating Precision and RecallExcel (12 KB)Sample Excel (12 KB)
EMP-P4-10Third-Party Audit Findings Remediation ReportPM / Dev TeamLCorrective actions and before/after evidence report for application, DB, and security findings from an Electronic Government Act Art. 57 auditWord (36 KB)Sample Word (36 KB)
EMP-P4-11User Acceptance Test (UAT) Sign-off Certificate (Sign-off #3)QA / Client BusinessS · M · LSign-off verifying direct business-user test pass, zero critical/major defects, and approval for production go-liveWord (36 KB)
MD (1 KB)
Sample Word (36 KB)

Phase 5. Go-Live, Final Acceptance, Settlement & Maintenance Phase (Release & Settlement) (19 Templates) ​

Cutover & rollback runbooks, data reconciliation (zero discrepancy), pilot, manuals & training, final acceptance (Sign-off #4), final billing, SLA, and AI FinOps

Doc CodeDocument TitleOwner RoleApplicable ScalePurpose & Key ContentsBlank TemplateFilled Example (Sample)
EMP-P5-01System Cutover Plan PresentationPM / DevOpsM · LPresentation covering production cutover strategy, rehearsal scenarios, emergency organization, and rollback decision criteriaPPT (149 KB)Sample PPT (149 KB)
EMP-P5-02System Cutover D-Day ChecklistDevOps / PMM · L3-sheet checklist for D-7 pre-checks, hourly D-Day cutover execution, and D+1 post-launch verificationExcel (88 KB)Sample Excel (88 KB)
EMP-P5-03System Deployment & Emergency Rollback RunbookDevOps / OpsS · M · LOperational runbook for zero-downtime production deployment, DB backups, smoke tests, and emergency rollbackWord (36 KB)Sample Word (36 KB)
EMP-P5-04Data Migration Reconciliation SheetDBA / DataM · L100% cross-reconciliation of record counts and cumulative transaction amounts between source and target DBs (zero discrepancy)Excel (7 KB)
MD (1 KB)
Sample Excel (7 KB)
EMP-P5-05Pilot Operation Results ReportPM / Business LeadLReport evaluating 2-week pre-launch pilot throughput, lead-time reduction, and go/no-go verdict for full launchPPT (211 KB)Sample PPT (211 KB)
EMP-P5-06User & System Administrator Integrated ManualTech Writer / PlannerS · M · LComprehensive manual covering screen usage for end users and permission, backup, and incident checks for IT adminsWord (36 KB)Sample Word (36 KB)
EMP-P5-07Business User Manual Training DeckTech Writer / TrainingM · LTraining slides for business users covering login, 4 core workflow steps, AI citation verification, and FAQsPPT (215 KB)Sample PPT (215 KB)
EMP-P5-08System Operator Manual Training DeckDevOps / OpsM · LTraining slides for IT operations covering daily/monthly checks, account/batch admin, and P1–P4 incident responsePPT (211 KB)Sample PPT (211 KB)
EMP-P5-09Training Plan & Execution Results ReportPM / Training LeadM · LCombined training curriculum plan for client users/admins plus attendance sign-off sheets and satisfaction survey resultsWord (38 KB)Sample Word (38 KB)
EMP-P5-10Operations Knowledge Transfer & Handover PlanPM / Tech LeadM · LPlan for official handover of deliverables, source code, accounts, certificates, and operational authority plus stabilization supportWord (39 KB)Sample Word (39 KB)
EMP-P5-11Project Completion (Closeout) PresentationLead PMM · LCloseout presentation covering overall progress, final outcomes vs. targets, deliverable completeness check, and maintenance planPPT (149 KB)Sample PPT (149 KB)
EMP-P5-12Final Acceptance Certificate & Handover Receipt (Sign-off #4)PM / Acceptance LeadS · M · L · LegalOfficial receipt certifying contract completion, legal basis for final balance billing, and start of the 1-year free defect warrantyWord (39 KB)
MD (2 KB)
Sample Word (39 KB)
EMP-P5-13Final Completion (Balance) Payment Invoice LetterManagement Support / FinanceS · M · L · LegalOfficial letter with document number, 30% balance claim, bank account details, and checklist of 7 required attachments (tax clearance, warranty bond, etc.)Word (36 KB)
MD (1 KB)
Sample Word (36 KB)
EMP-P5-14Defect Warranty & Maintenance SLA AgreementMaintenance / SalesS · M · L · LegalSLA agreement codifying the boundary between 1-year free defect warranty and paid maintenance, plus P1–P4 severity SLAsWord (36 KB)
MD (2 KB)
Sample Word (36 KB)
EMP-P5-15System Incident Report (Post-Mortem)Tech Lead / OpsM · LOfficial post-mortem documenting incident details, timeline, 5-Whys root cause analysis, and recurrence prevention measuresWord (36 KB)Sample Word (36 KB)
EMP-P5-16Monthly Periodic Inspection Operations ReportInfra / MaintenanceM · LMonthly checklist covering server resources, DB connections, off-site backups, security patches, and SLA availability (99.9%)Excel (7 KB)Sample Excel (7 KB)
EMP-P5-17Maintenance Service Request (SR Form)Maintenance TeamLFormal request and approval form for client feature enhancements, data corrections, and scheduled tasks during operationsWord (36 KB)Sample Word (36 KB)
EMP-P5-18Defect Warranty Intake & Resolution RegisterMaintenance TeamLRegister tracking defect intake, root cause analysis, patch completion date, and client verification during the free warranty periodExcel (7 KB)Sample Excel (7 KB)
EMP-P5-19Monthly AI FinOps (LLM & OCR Token) Settlement ReportAI Ops / PMM · L · AI3-sheet settlement ledger tracking calls by model, token consumption, semantic cache savings, and departmental chargebackExcel (9 KB)Sample Excel (9 KB)

5 PMBOK management plans, integrated quality checklist, 5 legal templates for subcontracting/freelancers (3.3%), and 2 crisis response forms

Doc CodeDocument TitleOwner RoleApplicable ScalePurpose & Key ContentsBlank TemplateFilled Example (Sample)
EMP-C0-01Project Document Management PlanPMO / PMLPlan governing deliverable directory structure, file naming/versioning rules, review/approval, and archiving (5-year retention)Word (47 KB)Sample Word (47 KB)
EMP-C0-02Reporting Governance Management PlanPMO / PMLSpecification of weekly, monthly, and phase-gate official reporting cycles, audiences, and issue escalation pathsWord (48 KB)Sample Word (48 KB)
EMP-C0-03Project Resource Management PlanPMO / PMLAllocation and control plan for assigned staff, development hardware (JDK 25/Docker), and cloud/test environmentsWord (49 KB)Sample Word (49 KB)
EMP-C0-04Project Schedule Progress Management PlanPMO / PMLPlan defining WBS weighting baselines, planned vs. actual progress measurement, and recovery procedures for delays (exceeding -5%p)Word (48 KB)Sample Word (48 KB)
EMP-C0-05Project Quality Management PlanQA Lead / PMLQuality plan covering target metrics (defect density, test coverage, zero vulnerabilities), 4-Cycle verification, and audit readinessWord (116 KB)Sample Word (115 KB)
EMP-C0-06Phase-by-Phase Integrated Quality ChecklistQA Lead / PMM · L5-sheet integrated quality checklist covering process and deliverables across analysis, planning, design, development, test, and cutoverExcel (143 KB)Sample Excel (141 KB)
EMP-C0-07PM Communication & Periodic Reporting ChecklistPMO / PMLMaster PM checklist to prevent missed meetings, status reports, and gate approvals across the project lifecycleExcel (7 KB)Sample Excel (7 KB)
EMP-C0-08Standard Outsourced Development Subcontract AgreementLegal / Project OpsM · L · LegalSubcontract agreement featuring acceptance-linked payment (30/40/30), back-to-back 1-year warranty/liquidated damages, full IP transfer, and no re-subcontractingWord (36 KB)
MD (2 KB)
Sample Word (36 KB)
EMP-C0-09Freelancer Service Entrustment Agreement (3.3%)Management Support / PMM · L · LegalIndependent contractor agreement explicitly excluding employment status, applying 3.3% withholding tax, deliverable acceptance, and IP assignmentWord (36 KB)
MD (2 KB)
Sample Word (36 KB)
EMP-C0-10Subcontractor & Freelancer Security PledgeSecurity / PMM · L · LegalPledge prohibiting source-code export to personal repositories, enforcing personal data de-identification, and mandating immediate local destruction upon completionWord (36 KB)Sample Word (36 KB)
EMP-C0-11Outsourced Development Statement of Work (SOW)Tech Lead (TL)M · L · LegalSOW specifying outsourced modules/APIs, Given-When-Then acceptance criteria, and coding standard complianceWord (36 KB)Sample Word (36 KB)
EMP-C0-12Subcontractor Acceptance Certificate & Progress EvaluationTech Lead / PMM · L · LegalEvaluation sheet verifying completed features per module, 100% unit test pass rate, and subcontractor payment approvalExcel (7 KB)Sample Excel (7 KB)
EMP-C0-13Security Incident & Personal Data Breach Notification FormCPO / SecurityL · LegalOfficial reporting form for KISA and PIPC within 72 hours of discovery pursuant to Article 34 of PIPAWord (36 KB)Sample Word (36 KB)
EMP-C0-14Early Termination Progress Settlement AgreementCEO / LegalL · LegalSettlement agreement confirming earned progress (S-Curve), advance payment offset, and non-litigation closure upon early terminationWord (36 KB)Sample Word (36 KB)

Full texts of core templates ready to copy directly into Notion, Confluence, or internal wikis without Office software. All clauses are synchronized 1:1 with the Word (.docx) and Markdown (.md) download files above.

[EMP-P0-01] Mutual Non-Disclosure Agreement (NDA) Full Markdown Text
markdown
# Mutual Non-Disclosure Agreement (NDA)

- Document Code: `EMP-P0-01` | Version: `v2.0`

{{Client Name}} (hereinafter referred to as "Party A") and Empasy Inc. (hereinafter referred to as "Party B") enter into this Agreement as follows to protect confidential information exchanged in connection with the execution of "{{Project Name}}" (hereinafter referred to as the "Engagement").

### Article 1 (Purpose)
The purpose of this Agreement is to protect all technical, business, data, and other confidential information disclosed by either Party to the other during the evaluation, Proof of Concept (PoC), proposal, contracting, and execution of the "Engagement," and to prevent unauthorized external disclosure.

### Article 2 (Definition of Confidential Information)
1. "Confidential Information" means all business plans, architectures, source code, database schemas, LLM prompts and rule dictionaries, cost structures, and client data disclosed or delivered in writing, orally, electronically, or by any other means.
2. Information delivered in writing or electronic files shall be marked "Confidential," and information disclosed orally shall be confirmed as confidential in writing within 14 days of disclosure.

### Article 3 (Confidentiality Obligations & Prohibition of External AI Training)
1. Neither Party may use Confidential Information received from the other for any purpose other than the "Engagement" (including proposals to other clients or training external general-purpose AI/LLM models), nor disclose, distribute, or reproduce it to any third party without the other Party's prior written consent.
2. The receiving Party shall limit disclosure strictly to employees and approved partner personnel with a need to know and shall bind them to equivalent confidentiality obligations.

### Article 4 (Return and Destruction of Information)
Upon expiration of this Agreement or upon the other Party's written request for return, the receiving Party shall permanently destroy all originals, copies, and electronic files by irreversible means within 14 days and issue a certificate of destruction upon request.

### Article 5 (Term and Damages)
1. This Agreement takes effect on the execution date and remains valid for three (3) years from the date Confidential Information is disclosed.
2. A breaching Party shall compensate the other Party for ordinary damages incurred, and the Seoul Central District Court shall have exclusive jurisdiction.

---
**Execution Date: {{YYYY}}-{{MM}}-{{DD}}**

- **[Party A] Client**: {{Client Name}} / Business Reg. No.: {{Business Registration No.}} / CEO {{Client CEO}} (Seal/Signature)
- **[Party B] Contractor**: Empasy Inc. / Business Reg. No.: {{Business Registration No.}} / CEO {{Vendor CEO}} (Seal/Signature)
[EMP-P1-20] Scope of Work Freeze Agreement (Scope Freeze Sign-off #1) Full Markdown Text
markdown
# Scope of Work Confirmation & Requirements Freeze Agreement (Scope Freeze Sign-off)

- Document Code: `EMP-P1-20` | Version: `v2.0` | Official Gate: **Sign-off #1**

- Engagement Name: {{Project Name}} (Contract No.: {{Contract No.}})
- Client / Contractor: {{Client Name}} / Empasy Inc.

### 1. Baseline Deliverables Confirmed
- Software Requirements Specification (`EMP-P1-13` v1.0, Total {{Requirement Count}} items)
- Requirements Traceability Matrix (`EMP-P1-14` v1.0, bidirectional WBS, design, and test mapping)
- Internal/External Interface Specification Pre-Agreement (`EMP-P1-19` v1.0)

### 2. Four Principles of Scope Freeze
1. **Finality of Scope**: Only items registered in the confirmed Software Requirements Specification (`EMP-P1-13`) are finalized as the official development scope of this Engagement.
2. **Invalidation of Verbal Requests**: After the date of this Agreement, verbal instructions given via meetings or messengers shall have no contractual effect whatsoever.
3. **Change Control (CR) Linkage**: Any scope change requires submitting an official Change Request (`EMP-P3-10`). Work **exceeding 3 M/D** (5 M/D where stipulated in large-scale contracts) shall commence only after agreeing on a low-priority feature swap, schedule extension, or contract price adjustment.
4. **Approval to Enter Next Phase**: The Client officially approves entry into **Phase 2: Design & Specification**.

---
**Agreement Date: {{YYYY}}-{{MM}}-{{DD}}**
- **[Client Business Lead]**: {{Client Name}} {{Department}} {{Client Business PM}} (Seal/Signature)
- **[Client IT Lead]**: {{Client Name}} {{IT Department}} {{Client IT Lead}} (Seal/Signature)
- **[Contractor Project Lead]**: Empasy Inc. Lead PM {{Vendor Lead PM}} (Seal/Signature)
[EMP-P3-10] Change Request Form (CR Form) Full Markdown Text
markdown
# Change Request Form (CR Form)

- Document Code: `EMP-P3-10` | Version: `v2.0`

### 1. Basic Change Request Information
- CR No.: `CR-{{YYYY}}-{{Seq}}`
- Request Date / Requesting Dept / Requester: {{YYYY-MM-DD}} / {{Requesting Dept}} / {{Requester}}
- Change Type: `[ ] New Feature Addition` / `[ ] Existing Spec Modification` / `[ ] Interface/Policy Change`

### 2. Change Details
- **Background & Rationale**: {{Describe rationale for change}}
- **Before (As-Is)**: {{Confirmed Existing Requirement/Design}}
- **After (To-Be)**: {{Requested Change Specification}}

### 3. Quantitative Impact & Effort Analysis (Completed by Contractor)
- Affected DB Tables: {{N}} / Affected APIs & Modules: {{N}} / Affected Screens: {{N}}
- **Total Required Effort**: `{{Required_MD}} M/D` (Exceeds 3 M/D: `[ ] Yes (Exceeds)` / `[ ] No (Within 3 M/D)`)
- **Schedule & Cost Resolution**: `[ ] Feature Swap within Existing Schedule` / `[ ] Schedule Extension (+{{N}} days)` / `[ ] Additional Contract`

### 4. Final Review Decision
- Decision: `[ ] Approved` / `[ ] Conditionally Approved` / `[ ] Deferred to Next Phase` / `[ ] Rejected`
- **[Client PM]**: {{Client Business PM}} (Signature) | **[Contractor PM]**: {{Vendor Lead PM}} (Signature)
[EMP-P5-12] Final Acceptance Certificate & Handover Receipt (Sign-off #4) Full Markdown Text
markdown
# Final Acceptance Certificate & System Handover Receipt (Final Acceptance Sign-off)

- Document Code: `EMP-P5-12` | Version: `v2.0` | Official Gate: **Sign-off #4 (Basis for Final Balance Billing)**

### 1. Engagement & Contract Information
- Project Name / Contract No.: {{Project Name}} / {{Contract No.}}
- Contract Period: {{Start Date}} ~ {{Completion Date}}
- Total Contract Amount: KRW {{Total Contract Amount}} (VAT included)
- Final Balance Accepted Now: KRW {{Final Balance Amount}} (30% final balance — 100% cumulative acceptance)

### 2. Delivered Artifacts & Quality Inspection Breakdown
- `[x]` Initiation & Management Artifacts (PMP, WBS, Meeting Minutes, Issue/Defect/Change Registers) — Passed
- `[x]` Analysis & Design Artifacts (SRS, RTM, Screen Design Spec, SAD, DB Spec, Interface Spec) — Passed
- `[x]` Implementation, Test & Security Artifacts (Source Code, Unit/Integration Tests, MOIS & KISA 49 Security Rules, OSS, AI Golden-Set) — Passed
- `[x]` Cutover, Training & Manuals (Migration Reconciliation, User/Admin Manuals, Training Results, Handover Plan) — Passed

### 3. Final Verdict & Commencement of Defect Warranty
- **Final Verdict**: `[ PASSED (Final Acceptance Passed) ]`
- **Free Defect Warranty Period (1 Year)**: {{Warranty Start Date}} ~ {{Warranty End Date}}

**Acceptance Completion Date: {{YYYY}}-{{MM}}-{{DD}}**
- **[Client Representative / Inspector]**: {{Client Name}} CEO {{Client CEO}} (Official Seal)
- **[Contractor Representative]**: Empasy Inc. CEO {{Vendor CEO}} (Official Seal)
[EMP-C0-08] Standard Outsourced Development Subcontract Agreement Full Markdown Text
markdown
# Standard Software Development Subcontract Agreement

- Document Code: `EMP-C0-08` | Version: `v2.0`

Empasy Inc. (hereinafter "Party A") and {{Subcontractor Name}} (hereinafter "Party B") enter into this Subcontract Agreement for the completion and delivery of "{{Subcontracted Scope Name}}" within "{{Project Name}}" (hereinafter the "Services") as follows.

### Article 1 (Purpose & Scope of Work)
Party B shall complete and deliver the software development scope in accordance with the functional specifications and schedule ({{Start Date}} ~ {{End Date}}) set forth in the attached Statement of Work (`EMP-C0-11` SOW).

### Article 2 (Subcontract Fee & Payment Terms — Total KRW {{Subcontract Amount}}, VAT included)
1. **Advance Payment (30%)**: Paid in cash within 15 days after contract execution and submission of kickoff notice and surety bond.
2. **Interim Payment (40%)**: Paid upon completion of DEV environment implementation and passing unit test inspection.
3. **Final Balance (30%)**: Paid within 14 days of passing final integration test acceptance (`EMP-C0-12`) and receiving the tax invoice.

### Article 3 (Full Assignment of Intellectual Property & Waiver of Moral Rights)
All economic copyrights (including derivative works rights) in the source code and all deliverables developed by Party B under this Agreement shall be exclusively assigned to Party A upon payment, and Party B shall not exercise moral rights.

### Article 4 (Strict Prohibition of Re-Subcontracting)
Pursuant to Article 51 of the Software Promotion Act, Party B may not re-subcontract any part of this scope to a third party without the prior written approval of Party A and the Client.

### Article 5 (Defect Warranty & Back-to-Back Liquidated Damages)
1. Party B shall bear free defect warranty responsibility for defects in delivered artifacts for **one (1) year** from the date of final acceptance.
2. In the event of delayed delivery, **0.075%** of the subcontract amount per day of delay shall be deducted as liquidated damages.

**Execution Date: {{YYYY}}-{{MM}}-{{DD}}**
- **[Party A]**: Empasy Inc. CEO {{Vendor CEO}} (Seal/Signature) | **[Party B]**: {{Subcontractor Name}} CEO {{Subcontractor CEO}} (Seal/Signature)
[EMP-C0-09] Freelancer Service Entrustment Agreement (3.3%) Full Markdown Text
markdown
# Software Freelancer Service Entrustment Agreement

- Document Code: `EMP-C0-09` | Version: `v2.0`

Empasy Inc. (hereinafter the "Company") and independent professional freelancer {{Contractor Name}} (hereinafter the "Contractor") enter into this Service Entrustment Agreement for the completion and delivery of "{{Entrusted Scope Name}}" as follows.

### Article 1 (Confirmation of Independent Contractor Status — Explicit Exclusion of Employment)
1. Both Parties confirm that the Contractor is an independent sole proprietor completing deliverables based on independent professional expertise and is not an employee under the Labor Standards Act.
2. Provided that security policies are observed and milestone delivery schedules are met, the Contractor retains autonomous discretion over working hours and work location, and the Company exercises no attendance or time-clock supervision.
3. Upon payment of service fees, **3.3% business income tax shall be withheld** under applicable tax law, and the Contractor is not eligible for the four major social insurances or severance pay.

### Article 2 (Entrustment Period, Fee & Deliverable Acceptance)
- Entrustment Period: {{Start Date}} ~ {{End Date}}
- Total Service Fee: KRW {{Total Amount}} (gross amount before withholding tax)
- Acceptance & Payment: Paid in monthly installments on day {{Payment Day}} of each month after passing unit tests and deliverable acceptance against the Statement of Work (SOW).

### Article 3 (Intellectual Property Ownership & Security Obligations)
1. All economic copyrights (including derivative works rights) in source code and documents produced under this Agreement shall vest fully in the Company upon payment.
2. The Contractor shall not export source code to external personal repositories and shall permanently destroy all local files immediately upon completion of the scope.

**Execution Date: {{YYYY}}-{{MM}}-{{DD}}**
- **[Company]**: Empasy Inc. CEO {{Vendor CEO}} (Seal/Signature) | **[Contractor]**: {{Contractor Name}} (DOB: {{YYMMDD}}) (Seal/Signature)

4. Enterprise Standard Formatting & Retention Rules ​

  1. Compliance with the 90-8-2 Document Visual Standard:
    • Do not add arbitrary primary-color or fluorescent cell fills or colored sheet tabs; preserve the embedded Empasy theme (Empasy 90-8-2 Minimal) and the Malgun Gothic typeface.
  2. Compliance with Electronic Signatures & Corporate Seal Execution:
    • Legally binding templates (NDAs, contracts, the 4 Sign-offs, payment invoice letters, and subcontract/freelancer agreements) must be executed with the CEO's corporate seal or a certified electronic signature service (such as Modusign).
  3. 5-Year Statutory Document Retention & Audit Readiness:
    • To prepare for tax, Software Promotion Act, and AI Basic Act audits, archive all contracts, acceptance certificates, security records, and AI evaluation evidence permanently for at least 5 years from the project completion date.