Empasy Business & Project Management Standard Document Templates Download Center (125 Templates)
This center provides 125 deduplicated single-standard blank templates (Clean Blank Master), 121 real-world filled examples (SyncFlow AI Sample), and 14 synchronized Markdown (Quick Copy) templates side by side across the entire lifecycle of Empasy Business & Development Methodology v2.0 (Phase 0 Pre-sales through Phase 5 Go-Live & Settlement + C0 Common & Legal).
All Office templates are uniformly standardized under the Empasy 90-8-2 Restrained Consulting Design Standard (90% pure white and neutral gray, 8% Deep Executive Navy #0F2547, 2% Muted Gold #B08D4E, single Malgun Gothic typeface, Word ISO A4 with headers and footers, Excel freeze panes, A4 print layout, and automated formulas, and PPT 16:9 widescreen), making them immediately ready for monochrome printing and third-party audits across public, financial, and enterprise engagements.
1. Tailoring Preset Bulk Downloads by Project Scale (Templates + Examples Included)
Select a package tailored to your project scale and profile for one-click download. Preset ZIPs 1 through 5 package the Blank Master folder and the SyncFlow AI Sample folder separately so practitioners can reference filled examples while immediately editing blank templates.
| Package | Included Count | File Size | Composition & Recommended Use | Download |
|---|---|---|---|---|
| Enterprise Standard Integrated Master Pack (Full Public / Audit-Ready) | 125 templates + 121 examples | 18.4 MB | All-in-one pack for public, financial, and enterprise third-party audits — includes all 125 blank templates (including 14 MD files) + 121 SyncFlow AI filled examples | ZIP (18.4 MB) |
| Small / MVP Essential Pack (Small Tailoring) | 29 templates + 27 examples | 3.4 MB | Core set for projects under KRW 100M / 2–3 month short-term builds — includes 29 blank templates (including MD) + 27 corresponding filled examples | ZIP (3.4 MB) |
| Standard Enterprise Pack (Medium Tailoring) | 88 templates + 85 examples | 13.3 MB | Standard SI delivery set for KRW 100M–500M / 4–6 month enterprise builds — includes 88 blank templates (including MD) + 85 corresponding filled examples | ZIP (13.3 MB) |
| AI / LLM Project Specialized Pack (AI Add-on) | 10 templates + 8 examples | 1.0 MB | 2026 AI Basic Act governance, inference/prompts, golden datasets, and FinOps — includes 10 AI-specialized blank templates + 8 corresponding filled examples | ZIP (1.0 MB) |
| Legal, Contract, Subcontracting & Crisis Pack (Legal & Operations) | 18 templates + 18 examples | 1.1 MB | Dedicated pack for Legal & Management Support (NDA, contracts, advance payment, subcontracting, outsourcing, crisis response) — includes 18 blank templates (including MD) + 18 corresponding filled examples | ZIP (1.1 MB) |
| Filled Examples Reference Pack (SyncFlow AI Sample Reference Pack) | 121 examples | 8.8 MB | Dedicated to onboarding new PMs/planners and audit reference — standalone pack of all 121 real-world filled examples for the fictional engagement (Hanbit Global Co., Ltd. SyncFlow AI) | ZIP (8.8 MB) |
Two-Track Simultaneous Delivery Principle (Blank Master + Filled Sample)
- Blank Templates (Blank Master, 125 files): Organized with consistent placeholders such as
Client Name,Project Name, andContract No.for immediate deployment to active client engagements. - Filled Examples (SyncFlow AI Sample, 121 files): Reference copies populated with realistic project data based on a fictional client (Hanbit Global Co., Ltd.) and fictional engagement (
SyncFlow AI). You can also download the blank template and filled example side by side in every catalog row below.
2. Phase-by-Phase Single Standard Deliverable Catalog (Phase 0 – Phase 5 + Common/Legal)
All deliverables are managed under the EMP-{Phase}-{Seq} single code system. Check each row's Tailoring badge (S Small/MVP, M Standard Enterprise, L Public/Large Audit, AI AI-Specialized, Legal Management Support & Legal) and download both the Blank Template and Filled Example.
Common Governance & Training Masters (Governance & Guide) (6 Templates)
Initial project environment setup, Tailoring matrix by scale, integrated management master, and PM Practice Guide v2.0
| Doc Code | Document Title | Owner Role | Applicable Scale | Purpose & Key Contents | Blank Template | Filled Example (Sample) |
|---|---|---|---|---|---|---|
| EMP-G0-01 | Standard Project Deliverable Folder Structure | PMO / PM | S · M · L | Standard directory template mapped 1:1 to Phase 0–5 and C0 methodology for immediate kickoff deployment | ZIP (7 KB) | Common Guide |
| EMP-G0-02 | Project Methodology Tailoring Matrix | PMO / PM | M · L | Master matrix defining Mandatory (M) vs. Optional (O) deliverable applicability and owners by project scale (L/M/S) | Excel (23 KB) | Sample Excel (23 KB) |
| EMP-G0-03 | Project Integrated Management Master (7 Linked Sheets) | Lead PM | S · M · L | Single management master linking dashboard, milestones, deliverables, staffing, meeting minutes, issues/risks, and quality checks via formulas | Excel (19 KB) | Sample Excel (20 KB) |
| EMP-G0-04 | Project Management (PMBOK) Standard Glossary | PMO / All Roles | L | Comprehensive glossary of core PMBOK and software engineering terms and acronyms | Excel (73 KB) | Common Guide |
| EMP-G0-05P | Empasy Project Management Practice Guide v2.0 (Lecture Slides) | All-Role Training | M · L · AI | Official training deck covering the 2026 AI-Native business & PM lifecycle (Phase 0–5, 4 Sign-offs, AI Basic Act, FinOps, subcontracting & crisis response) | PPT (276 KB) | Common Guide |
| EMP-G0-05D | Empasy Project Management Practice Guide v2.0 (Handout PDF) | All-Role Training | S · M · L · AI | High-resolution vector PDF handout of the Empasy Project Management Practice Guide v2.0 for printing and distribution | PDF (548 KB) | Common Guide |
Phase 0. Pre-Sales & Proposal Phase (Pre-sales) (11 Templates)
Preventing unprofitable bids (Go/No-Go), 3-year TCO costing & estimation, technical proposals, PT defense, and pre-bid technical sign-off
| Doc Code | Document Title | Owner Role | Applicable Scale | Purpose & Key Contents | Blank Template | Filled Example (Sample) |
|---|---|---|---|---|---|---|
| EMP-P0-01 | Mutual Non-Disclosure Agreement (NDA) | Sales / Legal | S · M · L · Legal | Mutual trade-secret protection prior to RFP analysis, prohibition on training external general-purpose AI/LLM models, and 3-year confidentiality covenant | Word (36 KB) MD (3 KB) | Sample Word (36 KB) |
| EMP-P0-02 | Bid Feasibility Review Sheet (Go/No-Go) | Sales / Tech Lead | S · M · L | Quantitative review across 5 metrics—technology, profitability, schedule, reuse rate, and risk (Go decision at 70+ points) | Excel (9 KB) MD (1 KB) | Sample Excel (9 KB) |
| EMP-P0-03 | Pre-Sales Client Discovery Questionnaire | Presales / PM | M · L | Pre-visit Q&A checklist capturing business environment, integration targets, constraints, and requirements | Excel (8 KB) | Sample Excel (8 KB) |
| EMP-P0-04 | 3-Year TCO Cost Calculation Sheet | Sales / PM | M · L · AI | Integrated 3-year total cost of ownership sheet covering development labor, GPU/cloud infrastructure, and commercial LLM API token costs | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P0-05 | Project Award Execution Budget Sheet | Sales / Project Ops | M · L | Post-award cost and target margin control sheet by line item (labor, direct expenses, subcontracting, contingency reserve) | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P0-06 | SW Development Official Standard Quotation | Sales / Finance | S · M · L | Official quotation cover sheet and breakdown based on person-months (M/M) and SW project pricing standards | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P0-07 | Proposal Work Breakdown Plan | Proposal PM | L | Author assignment by proposal section, review schedule, and submission checklist | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P0-08 | Preliminary Technical Proposal Brief | Proposal PM / AA | M · L · AI | Pre-proposal brief presenting client requirement analysis, target AI/cloud architecture, and technical direction | Word (36 KB) | Sample Word (36 KB) |
| EMP-P0-09 | Project Technical Proposal Standard Template | Proposal PM / Architect | S · M · L | Proposal deck covering business understanding, target 4-tier architecture, requirement fulfillment, delivery methodology, quality/security, staffing, and warranty support | PPT (230 KB) | Sample PPT (230 KB) |
| EMP-P0-10 | Proposal Presentation (PT) & Evaluator Q&A Defense Deck | Proposal PM / Sales | M · L | Presentation deck featuring 4 key differentiators, pre-PoC validation results, and 3-tier defense slides for top 10 evaluator challenge questions | PPT (218 KB) | Sample PPT (218 KB) |
| EMP-P0-11 | Technical Feasibility Pre-Approval (Technical Sign-off) | Tech Lead | M · L | Internal control form signed by the Development Lead prior to bidding to confirm technical feasibility, effort estimates, and schedule adequacy | Word (36 KB) | Sample Word (36 KB) |
Phase 1. Initiation & Requirements Analysis Phase (Inception & SRS) (22 Templates)
Main contract, kickoff notice, advance payment (30–50%), master WBS, SRS/RTM, AI governance review, and Scope Freeze (Sign-off #1)
| Doc Code | Document Title | Owner Role | Applicable Scale | Purpose & Key Contents | Blank Template | Filled Example (Sample) |
|---|---|---|---|---|---|---|
| EMP-P1-01 | Standard Software Service Agreement | Legal / Sales | S · M · L · Legal | Standard contract covering payment terms (30% advance, 40% interim, 30% final), 0.075% liquidated damages, IP ownership, and defect warranty | Word (36 KB) | Sample Word (36 KB) |
| EMP-P1-02 | Kickoff Notice & Project Management Plan (PMP) | Lead PM | S · M · L | Integrated PMP covering official kickoff filing, execution strategy, org chart & staffing, master schedule, quality/security/AI governance, and change control | Word (39 KB) | Sample Word (39 KB) |
| EMP-P1-03 | Project Management Plan Presentation Deck (PMP Deck) | PM / Architect | L | PMP presentation slides for executive and client kickoff review | PPT (379 KB) | Sample PPT (379 KB) |
| EMP-P1-04 | Official Kickoff Briefing Presentation | Lead PM | M · L | Briefing deck for client executives and business stakeholders covering the roadmap, delivery governance, deliverable plan, and support requests | PPT (241 KB) | Sample PPT (177 KB) |
| EMP-P1-05 | Kickoff Workshop Plan | PM | L | Agenda, participant R&R, and preparation checklist for the joint client-vendor kickoff workshop | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P1-06 | Advance Payment Request & Utilization Plan | Management Support / PM | M · L · Legal | Standard form for early billing of 30–50% advance payment, itemized usage plan, and advance payment surety bond attachment | Word (36 KB) MD (1 KB) | Sample Word (36 KB) |
| EMP-P1-07 | SW Project Subcontracting Pre-Approval Application | PM / Management Support | L · Legal | Application complying with Article 51 of the Software Promotion Act, capping subcontracting under 50% and prohibiting re-subcontracting | Word (36 KB) MD (1 KB) | Sample Word (36 KB) |
| EMP-P1-08 | Staff Security Pledge & Personal Data Processing Entrustment Agreement | Security / Legal | S · M · L · Legal | Source-code exfiltration prohibition pledge for all assigned staff and PIPA-compliant personal data processing entrustment contract | Word (36 KB) | Sample Word (36 KB) |
| EMP-P1-09 | Project Contact Directory & Cadence Matrix | PMO / PM | M · L | Emergency contact directory across client, prime, and partners, R&R, and regular reporting/collaboration channel definitions | Excel (10 KB) | Sample Excel (10 KB) |
| EMP-P1-10 | Work Breakdown Structure (WBS Master) | Lead PM | S · M · L | Phase 0–5 full-lifecycle WBS with weight-based automated planned/actual progress calculation (SUMPRODUCT) and holiday calendar | Excel (14 KB) | Sample Excel (14 KB) |
| EMP-P1-11 | Executive Milestone Summary Timeline | Lead PM | M · L | Summary deck highlighting key milestone dates, the 4 major Sign-off gates, and decision checkpoints | PPT (157 KB) | Sample PPT (157 KB) |
| EMP-P1-12 | Scope of Work Confirmation & Deliverable List | PM / BA | M · L | Integrated 2-sheet tracker for in-scope/out-of-scope boundaries, assumptions, and official phase deliverables | Excel (10 KB) | Sample Excel (10 KB) |
| EMP-P1-13 | Software Requirements Specification (SRS) | Planner / BA | S · M · L | 4-sheet detailed specification covering Functional (SFR), Data (DAR), Interface (SIR), Security (SER), and Quality (QUR) requirements | Excel (103 KB) | Sample Excel (103 KB) |
| EMP-P1-14 | Requirements Traceability Matrix (RTM) | BA / QA | S · M · L | 3-sheet bidirectional traceability matrix linking Requirement ID <-> Screen Design <-> DB Table <-> Test Case | Excel (88 KB) | Sample Excel (88 KB) |
| EMP-P1-15 | Business Requirements Questionnaire & Content Supply List | Planner / BA | L | 2-sheet tracker for stakeholder interview Q&A and client-supplied data, images, and documents | Excel (9 KB) | Sample Excel (9 KB) |
| EMP-P1-16 | Target System Environment Analysis Report | Architect / Infra | L | Detailed analysis report of the client's existing IT infrastructure, servers, DBMS, network, and integration environment | Word (128 KB) | Sample Word (127 KB) |
| EMP-P1-17 | Benchmarking Analysis Report | Planner / BA | L | Comparison matrix of domestic and global AI/enterprise solutions and TO-BE design implications | PPT (143 KB) | Sample PPT (143 KB) |
| EMP-P1-18 | AS-IS Current Process Definition | Planner / BA | M · L | Current business workflow diagrams, bottleneck (pain-point) diagnosis, and automation candidate identification | PPT (142 KB) | Sample PPT (142 KB) |
| EMP-P1-19 | Internal/External Interface Specification Pre-Agreement | Architect / Interface PL | M · L | 4-sheet agreement pre-confirming integration methods, frequency, security, and SLA with legacy system owners (SSO, portal, DB) | Excel (12 KB) | Sample Excel (12 KB) |
| EMP-P1-20 | Scope of Work Freeze Agreement (Sign-off #1) | PM / Business Lead | S · M · L | SRS v1.0 scope freeze, invalidation of verbal requests, CR linkage for changes exceeding 3 M/D, and Phase 2 gate approval | Word (36 KB) MD (2 KB) | Sample Word (36 KB) |
| EMP-P1-21 | Assigned Staff Replacement Approval Request | PM / Project Ops | L · Legal | SW Promotion Act-compliant request for replacing departing staff with KOSA-equivalent or higher personnel and 5-business-day joint handover | Word (36 KB) | Sample Word (36 KB) |
| EMP-P1-22 | AI Governance & AI Basic Act Trustworthiness Checklist | AI Lead / Security / Legal | M · L · AI | Automated 18-item evaluation covering 2026 AI Basic Act high-impact AI classification, generation disclosure, PII masking, external training exclusion, and HITL gates | Excel (12 KB) | Sample Excel (12 KB) |
Phase 2. Spec-First Architecture & Detailed Design Phase (Design & Spec) (25 Templates)
Screen storyboard (Sign-off #2), SAD & firewall requests, 2026 development standards, data standardization & 9-sheet DB spec, API/batch & AI prompt design
| Doc Code | Document Title | Owner Role | Applicable Scale | Purpose & Key Contents | Blank Template | Filled Example (Sample) |
|---|---|---|---|---|---|---|
| EMP-P2-01 | Site & Menu Information Architecture (IA) | UI/UX Planner | M · L | 4-sheet mapping of Depth 1–4 portal and back-office menu hierarchy, URL paths, screen IDs, and role permissions | Excel (98 KB) | Sample Excel (98 KB) |
| EMP-P2-02 | Unit Function Specification | Planner / BA | M · L | 3-sheet detailed specification of screen/module unit functions, input/processing/output logic, and exception rules | Excel (100 KB) | Sample Excel (100 KB) |
| EMP-P2-03 | System Operations Policy Definition | Planner / BA | M · L | 3-sheet specification defining business and system policies including permissions, security, data retention periods, and AI decision thresholds | Excel (90 KB) | Sample Excel (90 KB) |
| EMP-P2-04 | TO-BE Target Process Definition | BA / Planner | M · L | Target business workflows after system/AI adoption, inter-system sequences, and role allocation | PPT (376 KB) | Sample PPT (376 KB) |
| EMP-P2-05 | Screen Design Common Layout Guide | UI/UX Planner | L | Common specifications for GNB/LNB/Footer regions, grids, shared popups, error messages, and interactions | PPT (122 KB) | Sample PPT (122 KB) |
| EMP-P2-06 | Screen Design Detailed Storyboard (UI/UX) | UI/UX Planner | S · M · L | Standard template for per-screen wireframes and numbered-badge component functional descriptions | PPT (202 KB) | Sample PPT (202 KB) |
| EMP-P2-07 | UI/UX Design Strategy & Visual Guide | Design Team | M · L | 90-8-2 color tokens, typography, Vben Admin component standards, and KWCAG 2.2 accessibility guide | PPT (224 KB) | Sample PPT (224 KB) |
| EMP-P2-08 | Copyrighted Image & Font Usage Register | Design Team | L | License evidence and usage tracking register for fonts, icons, and stock images adopted in the project | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P2-09 | Prototype Build Plan & Verification Report | Planner / Design | L | Combined plan for clickable prototype scope and test scenarios plus business feedback incorporation report | Word (38 KB) | Sample Word (38 KB) |
| EMP-P2-10 | UI Screen Design Approval Certificate (Sign-off #2) | UI/UX / Business | S · M · L | Official sign-off confirming the final screen count per menu and layout freeze (Design Freeze) | Word (36 KB) MD (1 KB) | Sample Word (36 KB) |
| EMP-P2-11 | System Architecture Definition (SAD) | Architect (AA) | S · M · L | Detailed specification of logical/physical servers, containers (EKS/Docker), network segmentation, and security architecture | Word (38 KB) | Sample Word (38 KB) |
| EMP-P2-12 | System Architecture Diagram Slides | Architect (AA) | M · L | Diagrams covering DEV/STG/PRD 3-tier isolation, internal/external ALB segmentation, and hybrid RAG architecture | PPT (503 KB) | Sample PPT (503 KB) |
| EMP-P2-13 | Cloud Infrastructure & Firewall Port Request | Infra / AA | M · L | 8-sheet request for DEV/STG/PRD cloud server sizing, firewall port matrices, and account provisioning | Excel (533 KB) | Sample Excel (543 KB) |
| EMP-P2-14 | Cloud Infrastructure Provisioning Request Diagram | Infra / AA | L | Slide deck requesting cloud resources and firewall policies for submission to client infrastructure/security teams | PPT (475 KB) | Sample PPT (475 KB) |
| EMP-P2-15 | Development Standards & Environment Definition (2026 Standard) | Tech Lead / DevOps | M · L | Enterprise standards for Java 25, Spring Boot 4.0, AgentScope, Lombok, PostgreSQL 18.6 6-File, Vue 3 Vben, and Zero-Mock | Word (38 KB) | Sample Word (38 KB) |
| EMP-P2-16 | Software Component Design Specification | Backend / Frontend | L | Class structures, method signatures, transaction boundaries, and exception handling specifications for core business modules | Word (36 KB) | Sample Word (36 KB) |
| EMP-P2-17 | Data Standard Terminology Definition (Audit Mandatory) | Data Architect (DA) | M · L | 5-sheet integrated data standardization specification covering Domain, Standard Word, and Standard Term dictionaries | Excel (16 KB) | Sample Excel (16 KB) |
| EMP-P2-18 | Common Code & Numbering Rule Specification (Audit Mandatory) | Data Architect (DA) | M · L | 5-sheet specification for common code groups, detail codes, session variables, and business ID numbering rules | Excel (99 KB) | Sample Excel (99 KB) |
| EMP-P2-19 | Logical & Physical Data Model Design Specification | DA / DBA | M · L | Integrated specification of logical ERD normalization by subject area and PostgreSQL 18.6 + pgvector HNSW/partitioning physical design | Word (38 KB) | Sample Word (38 KB) |
| EMP-P2-20 | Database Specification (9-Sheet Integrated · Audit Mandatory) | DBA / Backend | S · M · L | 9-sheet integrated DB schema specification covering Tables, Indexes, Views, Procedures, Functions, Triggers, and Sequences | Excel (113 KB) | Sample Excel (112 KB) |
| EMP-P2-21 | Process x Entity CRUD Matrix (Audit Mandatory) | DBA / Tech Lead | L | Correlation matrix mapping unit processes (screens, APIs, batches) against DB table Create/Read/Update/Delete operations | Excel (85 KB) | Sample Excel (85 KB) |
| EMP-P2-22 | Interface & REST API Specification (6 Sheets) | Backend PL | S · M · L | 6-sheet design specification covering Canonical URLs (/api/v1/...), internal/external interface inventory, connection details, and payload field mappings | Excel (129 KB) | Sample Excel (129 KB) |
| EMP-P2-23 | Batch Program Design Specification (Audit Mandatory) | Backend PL | L | Design specification for scheduled batch jobs, upstream/downstream dependencies, timeouts, and failure recovery | Excel (87 KB) | Sample Excel (87 KB) |
| EMP-P2-24 | AI Inference Pipeline & Prompt Design Specification | AI Engineer / AA | M · L · AI | Design specification for multimodal preprocessing -> hybrid RAG -> AgentScope inference pipeline and structured outputs | Word (37 KB) | Sample Word (37 KB) |
| EMP-P2-25 | Module-Level Detailed Development Schedule | Tech Lead / PM | L | Post-design developer assignment by unit feature/sprint and daily progress tracking schedule | Excel (7 KB) | Sample Excel (7 KB) |
Phase 3. AI-Collaborative Implementation & Progress/Change Control Phase (Implementation & Control) (17 Templates)
Weekly, monthly, and interim progress reports (3 separate templates), meeting minutes, effort/cost tracking, issues/risks/defects, 3 M/D change control (CR), interim acceptance, and Extension of Time (EOT)
| Doc Code | Document Title | Owner Role | Applicable Scale | Purpose & Key Contents | Blank Template | Filled Example (Sample) |
|---|---|---|---|---|---|---|
| EMP-P3-01 | Weekly Progress Report | Lead PM | S · M · L | Standard weekly report tracking this week's accomplishments, next week's plan, planned vs. actual progress, and key issues | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P3-02 | Monthly Progress Report (Executive Briefing) | Lead PM | M · L | Monthly executive deck covering S-Curve progress, phase status, monthly actuals/plans, risk/CR status, and effort burn | PPT (220 KB) | Sample PPT (220 KB) |
| EMP-P3-03 | Interim Report Presentation (Interim Payment Gate) | Lead PM | M · L | Presentation deck for 40% interim payment inspection and interim audit covering design completion, live demo, and second-half strategy | PPT (217 KB) | Sample PPT (217 KB) |
| EMP-P3-04 | Official Meeting Minutes 3-Type Package | PMO / PM | M · L | Integrated package of 3 official meeting templates: Kickoff, Infrastructure/Architecture Review, and Weekly Status | Word (39 KB) | Sample Word (39 KB) |
| EMP-P3-05 | Integrated Meeting Minutes & Action Item Register | PMO / PM | L | Master Excel log tracking all meeting agendas, decisions, and follow-up action item closure | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P3-06 | Monthly Effort (M/M) & Assigned Staff Profile | PM / Project Ops | M · L | Integrated tracker for monthly planned vs. actual M/M by role alongside staff career and technical grade profiles | Excel (25 KB) | Sample Excel (25 KB) |
| EMP-P3-07 | Project Cost Execution Control Ledger | PM / Project Ops | M · L | Tracker monitoring monthly actual costs (labor, cloud, subcontracting) and collections against contract budget | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P3-08 | Integrated Issue & Risk Register | PM / Tech Lead | S · M · L | 3-sheet register combining active issue tracking with potential risk mitigation plans | Excel (14 KB) | Sample Excel (14 KB) |
| EMP-P3-09 | Daily Check & Integrated Defect Tracking Register | QA / PMO | M · L | 4-sheet register for screen/feature daily checks, defect severity classification, and fix/retest tracking | Excel (106 KB) | Sample Excel (106 KB) |
| EMP-P3-10 | Change Request (CR Form) | PM / Business Requester | S · M · L | Agreement documenting As-Is vs. To-Be specs, quantitative DB/API/UI impact, and effort/schedule adjustments over 3 M/D | Word (36 KB) MD (1 KB) | Sample Word (36 KB) |
| EMP-P3-11 | Requirements & Design Change Cumulative Register | PMO / PM | M · L | Cumulative register tracking all submitted CRs, approval status, scope swaps, and effort deltas | Excel (8 KB) | Sample Excel (8 KB) |
| EMP-P3-12 | Interim Payment Inspection Request | PM / Sales | M · L · Legal | Formal application with interim milestone evidence requesting inspection for the 40% interim progress payment | Word (36 KB) | Sample Word (36 KB) |
| EMP-P3-13 | Extension of Time Request & Excusable Delay Proof (EOT) | PM / Legal | L · Legal | Formal claim proving client-attributed delays (firewall/data non-provision), liquidated damages waiver, and schedule extension | Word (36 KB) | Sample Word (36 KB) |
| EMP-P3-14 | REST API Developer Integration Manual | Backend PL | L | Developer manual covering authentication, common response envelopes, error codes, and API invocation for frontend and external integrators | Word (36 KB) | Sample Word (36 KB) |
| EMP-P3-15 | AI Business Rule Dictionary Specification | AI Engineer / BA | L · AI | Master dictionary of domain compliance rulesets (prohibited, caution, and allowed regexes plus standard replacement phrasing) | Excel (17 KB) | Sample Excel (17 KB) |
| EMP-P3-16 | AI Prompt Specification & Version Register | AI Engineer | M · L · AI | Register of phase-by-phase system/user prompt templates, model parameters (Temperature/Top-P), and JSON output schemas | Excel (10 KB) | Sample Excel (10 KB) |
| EMP-P3-17 | Legacy Core System DB Integration Detail Specification | Backend / Interface PL | L | Detailed implementation specification for client core DB view queries, daily batch sync schedules, and column mappings | Excel (8 KB) | Sample Excel (8 KB) |
Phase 4. Quality Verification, Security & Audit Phase (Verification & Audit) (11 Templates)
Unit and integration testing, MOIS & KISA 49 secure coding checks, OSS licenses, performance, AI golden-set evaluation, third-party audit, and UAT (Sign-off #3)
| Doc Code | Document Title | Owner Role | Applicable Scale | Purpose & Key Contents | Blank Template | Filled Example (Sample) |
|---|---|---|---|---|---|---|
| EMP-P4-01 | Unit Test Plan | Dev Lead / QA | L | Plan defining JUnit 5 / Vitest unit test scope per module, isolation principles, and coverage pass criteria | Word (129 KB) | Sample Word (128 KB) |
| EMP-P4-02 | Unit Test Cases & Results | Dev / QA | M · L | 8-sheet unit test case specification recording inputs, expected results, actual results, and pass/fail verdicts per module | Excel (109 KB) | Sample Excel (109 KB) |
| EMP-P4-03 | Integration Test Plan | QA Lead | L | Plan defining E2E system integration test schedule, environments, scenario structure, and defect resolution procedures | Word (129 KB) | Sample Word (128 KB) |
| EMP-P4-04 | Integration Test Scenarios & Results | QA Engineer | S · M · L | 3-sheet evidence report documenting workflow-based E2E integration test steps, expected-value checks, and final pass records | Excel (95 KB) | Sample Excel (95 KB) |
| EMP-P4-05 | System Installation Plan (2026 Cloud/K8s) | DevOps / Infra | L | Installation, verification, and rollback plan for STG/PRD containers, PostgreSQL 18.6, Redis, and MinIO | Word (37 KB) | Sample Word (37 KB) |
| EMP-P4-06 | SW Secure Coding 49-Rule Checklist (MOIS & KISA) | Security / Tech Lead | M · L | Diagnostic and remediation report covering all 49 secure coding weaknesses across 7 domains per MOIS and KISA guidelines | Excel (10 KB) | Sample Excel (10 KB) |
| EMP-P4-07 | Open Source (OSS) License Verification & SBOM | Security / Tech Lead | M · L | Verification table of adopted OSS inventory, Apache/MIT/BSD compliance, GPL contamination prevention, and NOTICE attribution | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P4-08 | Performance & Load Test Results Report | Infra / QA | M · L | SLA proof report measuring target virtual users (VU), TPS, mean/P95 response times, and resource utilization | Excel (8 KB) | Sample Excel (8 KB) |
| EMP-P4-09 | AI Golden-Set Quantitative Quality Evaluation Report | AI Engineer / QA | M · L · AI | 1:1 comparison of AI outputs against a 50-question domain ground-truth dataset evaluating Precision and Recall | Excel (12 KB) | Sample Excel (12 KB) |
| EMP-P4-10 | Third-Party Audit Findings Remediation Report | PM / Dev Team | L | Corrective actions and before/after evidence report for application, DB, and security findings from an Electronic Government Act Art. 57 audit | Word (36 KB) | Sample Word (36 KB) |
| EMP-P4-11 | User Acceptance Test (UAT) Sign-off Certificate (Sign-off #3) | QA / Client Business | S · M · L | Sign-off verifying direct business-user test pass, zero critical/major defects, and approval for production go-live | Word (36 KB) MD (1 KB) | Sample Word (36 KB) |
Phase 5. Go-Live, Final Acceptance, Settlement & Maintenance Phase (Release & Settlement) (19 Templates)
Cutover & rollback runbooks, data reconciliation (zero discrepancy), pilot, manuals & training, final acceptance (Sign-off #4), final billing, SLA, and AI FinOps
| Doc Code | Document Title | Owner Role | Applicable Scale | Purpose & Key Contents | Blank Template | Filled Example (Sample) |
|---|---|---|---|---|---|---|
| EMP-P5-01 | System Cutover Plan Presentation | PM / DevOps | M · L | Presentation covering production cutover strategy, rehearsal scenarios, emergency organization, and rollback decision criteria | PPT (149 KB) | Sample PPT (149 KB) |
| EMP-P5-02 | System Cutover D-Day Checklist | DevOps / PM | M · L | 3-sheet checklist for D-7 pre-checks, hourly D-Day cutover execution, and D+1 post-launch verification | Excel (88 KB) | Sample Excel (88 KB) |
| EMP-P5-03 | System Deployment & Emergency Rollback Runbook | DevOps / Ops | S · M · L | Operational runbook for zero-downtime production deployment, DB backups, smoke tests, and emergency rollback | Word (36 KB) | Sample Word (36 KB) |
| EMP-P5-04 | Data Migration Reconciliation Sheet | DBA / Data | M · L | 100% cross-reconciliation of record counts and cumulative transaction amounts between source and target DBs (zero discrepancy) | Excel (7 KB) MD (1 KB) | Sample Excel (7 KB) |
| EMP-P5-05 | Pilot Operation Results Report | PM / Business Lead | L | Report evaluating 2-week pre-launch pilot throughput, lead-time reduction, and go/no-go verdict for full launch | PPT (211 KB) | Sample PPT (211 KB) |
| EMP-P5-06 | User & System Administrator Integrated Manual | Tech Writer / Planner | S · M · L | Comprehensive manual covering screen usage for end users and permission, backup, and incident checks for IT admins | Word (36 KB) | Sample Word (36 KB) |
| EMP-P5-07 | Business User Manual Training Deck | Tech Writer / Training | M · L | Training slides for business users covering login, 4 core workflow steps, AI citation verification, and FAQs | PPT (215 KB) | Sample PPT (215 KB) |
| EMP-P5-08 | System Operator Manual Training Deck | DevOps / Ops | M · L | Training slides for IT operations covering daily/monthly checks, account/batch admin, and P1–P4 incident response | PPT (211 KB) | Sample PPT (211 KB) |
| EMP-P5-09 | Training Plan & Execution Results Report | PM / Training Lead | M · L | Combined training curriculum plan for client users/admins plus attendance sign-off sheets and satisfaction survey results | Word (38 KB) | Sample Word (38 KB) |
| EMP-P5-10 | Operations Knowledge Transfer & Handover Plan | PM / Tech Lead | M · L | Plan for official handover of deliverables, source code, accounts, certificates, and operational authority plus stabilization support | Word (39 KB) | Sample Word (39 KB) |
| EMP-P5-11 | Project Completion (Closeout) Presentation | Lead PM | M · L | Closeout presentation covering overall progress, final outcomes vs. targets, deliverable completeness check, and maintenance plan | PPT (149 KB) | Sample PPT (149 KB) |
| EMP-P5-12 | Final Acceptance Certificate & Handover Receipt (Sign-off #4) | PM / Acceptance Lead | S · M · L · Legal | Official receipt certifying contract completion, legal basis for final balance billing, and start of the 1-year free defect warranty | Word (39 KB) MD (2 KB) | Sample Word (39 KB) |
| EMP-P5-13 | Final Completion (Balance) Payment Invoice Letter | Management Support / Finance | S · M · L · Legal | Official letter with document number, 30% balance claim, bank account details, and checklist of 7 required attachments (tax clearance, warranty bond, etc.) | Word (36 KB) MD (1 KB) | Sample Word (36 KB) |
| EMP-P5-14 | Defect Warranty & Maintenance SLA Agreement | Maintenance / Sales | S · M · L · Legal | SLA agreement codifying the boundary between 1-year free defect warranty and paid maintenance, plus P1–P4 severity SLAs | Word (36 KB) MD (2 KB) | Sample Word (36 KB) |
| EMP-P5-15 | System Incident Report (Post-Mortem) | Tech Lead / Ops | M · L | Official post-mortem documenting incident details, timeline, 5-Whys root cause analysis, and recurrence prevention measures | Word (36 KB) | Sample Word (36 KB) |
| EMP-P5-16 | Monthly Periodic Inspection Operations Report | Infra / Maintenance | M · L | Monthly checklist covering server resources, DB connections, off-site backups, security patches, and SLA availability (99.9%) | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P5-17 | Maintenance Service Request (SR Form) | Maintenance Team | L | Formal request and approval form for client feature enhancements, data corrections, and scheduled tasks during operations | Word (36 KB) | Sample Word (36 KB) |
| EMP-P5-18 | Defect Warranty Intake & Resolution Register | Maintenance Team | L | Register tracking defect intake, root cause analysis, patch completion date, and client verification during the free warranty period | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-P5-19 | Monthly AI FinOps (LLM & OCR Token) Settlement Report | AI Ops / PM | M · L · AI | 3-sheet settlement ledger tracking calls by model, token consumption, semantic cache savings, and departmental chargeback | Excel (9 KB) | Sample Excel (9 KB) |
Common PM Plans, Subcontracting/Freelance & Crisis Management Templates (PM Plans, Subcontract & Legal) (14 Templates)
5 PMBOK management plans, integrated quality checklist, 5 legal templates for subcontracting/freelancers (3.3%), and 2 crisis response forms
| Doc Code | Document Title | Owner Role | Applicable Scale | Purpose & Key Contents | Blank Template | Filled Example (Sample) |
|---|---|---|---|---|---|---|
| EMP-C0-01 | Project Document Management Plan | PMO / PM | L | Plan governing deliverable directory structure, file naming/versioning rules, review/approval, and archiving (5-year retention) | Word (47 KB) | Sample Word (47 KB) |
| EMP-C0-02 | Reporting Governance Management Plan | PMO / PM | L | Specification of weekly, monthly, and phase-gate official reporting cycles, audiences, and issue escalation paths | Word (48 KB) | Sample Word (48 KB) |
| EMP-C0-03 | Project Resource Management Plan | PMO / PM | L | Allocation and control plan for assigned staff, development hardware (JDK 25/Docker), and cloud/test environments | Word (49 KB) | Sample Word (49 KB) |
| EMP-C0-04 | Project Schedule Progress Management Plan | PMO / PM | L | Plan defining WBS weighting baselines, planned vs. actual progress measurement, and recovery procedures for delays (exceeding -5%p) | Word (48 KB) | Sample Word (48 KB) |
| EMP-C0-05 | Project Quality Management Plan | QA Lead / PM | L | Quality plan covering target metrics (defect density, test coverage, zero vulnerabilities), 4-Cycle verification, and audit readiness | Word (116 KB) | Sample Word (115 KB) |
| EMP-C0-06 | Phase-by-Phase Integrated Quality Checklist | QA Lead / PM | M · L | 5-sheet integrated quality checklist covering process and deliverables across analysis, planning, design, development, test, and cutover | Excel (143 KB) | Sample Excel (141 KB) |
| EMP-C0-07 | PM Communication & Periodic Reporting Checklist | PMO / PM | L | Master PM checklist to prevent missed meetings, status reports, and gate approvals across the project lifecycle | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-C0-08 | Standard Outsourced Development Subcontract Agreement | Legal / Project Ops | M · L · Legal | Subcontract agreement featuring acceptance-linked payment (30/40/30), back-to-back 1-year warranty/liquidated damages, full IP transfer, and no re-subcontracting | Word (36 KB) MD (2 KB) | Sample Word (36 KB) |
| EMP-C0-09 | Freelancer Service Entrustment Agreement (3.3%) | Management Support / PM | M · L · Legal | Independent contractor agreement explicitly excluding employment status, applying 3.3% withholding tax, deliverable acceptance, and IP assignment | Word (36 KB) MD (2 KB) | Sample Word (36 KB) |
| EMP-C0-10 | Subcontractor & Freelancer Security Pledge | Security / PM | M · L · Legal | Pledge prohibiting source-code export to personal repositories, enforcing personal data de-identification, and mandating immediate local destruction upon completion | Word (36 KB) | Sample Word (36 KB) |
| EMP-C0-11 | Outsourced Development Statement of Work (SOW) | Tech Lead (TL) | M · L · Legal | SOW specifying outsourced modules/APIs, Given-When-Then acceptance criteria, and coding standard compliance | Word (36 KB) | Sample Word (36 KB) |
| EMP-C0-12 | Subcontractor Acceptance Certificate & Progress Evaluation | Tech Lead / PM | M · L · Legal | Evaluation sheet verifying completed features per module, 100% unit test pass rate, and subcontractor payment approval | Excel (7 KB) | Sample Excel (7 KB) |
| EMP-C0-13 | Security Incident & Personal Data Breach Notification Form | CPO / Security | L · Legal | Official reporting form for KISA and PIPC within 72 hours of discovery pursuant to Article 34 of PIPA | Word (36 KB) | Sample Word (36 KB) |
| EMP-C0-14 | Early Termination Progress Settlement Agreement | CEO / Legal | L · Legal | Settlement agreement confirming earned progress (S-Curve), advance payment offset, and non-litigation closure upon early termination | Word (36 KB) | Sample Word (36 KB) |
3. Core Legal & Approval Templates for Instant Browser Copy (Clean Blank Master)
Full texts of core templates ready to copy directly into Notion, Confluence, or internal wikis without Office software. All clauses are synchronized 1:1 with the Word (.docx) and Markdown (.md) download files above.
[EMP-P0-01] Mutual Non-Disclosure Agreement (NDA) Full Markdown Text
# Mutual Non-Disclosure Agreement (NDA)
- Document Code: `EMP-P0-01` | Version: `v2.0`
{{Client Name}} (hereinafter referred to as "Party A") and Empasy Inc. (hereinafter referred to as "Party B") enter into this Agreement as follows to protect confidential information exchanged in connection with the execution of "{{Project Name}}" (hereinafter referred to as the "Engagement").
### Article 1 (Purpose)
The purpose of this Agreement is to protect all technical, business, data, and other confidential information disclosed by either Party to the other during the evaluation, Proof of Concept (PoC), proposal, contracting, and execution of the "Engagement," and to prevent unauthorized external disclosure.
### Article 2 (Definition of Confidential Information)
1. "Confidential Information" means all business plans, architectures, source code, database schemas, LLM prompts and rule dictionaries, cost structures, and client data disclosed or delivered in writing, orally, electronically, or by any other means.
2. Information delivered in writing or electronic files shall be marked "Confidential," and information disclosed orally shall be confirmed as confidential in writing within 14 days of disclosure.
### Article 3 (Confidentiality Obligations & Prohibition of External AI Training)
1. Neither Party may use Confidential Information received from the other for any purpose other than the "Engagement" (including proposals to other clients or training external general-purpose AI/LLM models), nor disclose, distribute, or reproduce it to any third party without the other Party's prior written consent.
2. The receiving Party shall limit disclosure strictly to employees and approved partner personnel with a need to know and shall bind them to equivalent confidentiality obligations.
### Article 4 (Return and Destruction of Information)
Upon expiration of this Agreement or upon the other Party's written request for return, the receiving Party shall permanently destroy all originals, copies, and electronic files by irreversible means within 14 days and issue a certificate of destruction upon request.
### Article 5 (Term and Damages)
1. This Agreement takes effect on the execution date and remains valid for three (3) years from the date Confidential Information is disclosed.
2. A breaching Party shall compensate the other Party for ordinary damages incurred, and the Seoul Central District Court shall have exclusive jurisdiction.
---
**Execution Date: {{YYYY}}-{{MM}}-{{DD}}**
- **[Party A] Client**: {{Client Name}} / Business Reg. No.: {{Business Registration No.}} / CEO {{Client CEO}} (Seal/Signature)
- **[Party B] Contractor**: Empasy Inc. / Business Reg. No.: {{Business Registration No.}} / CEO {{Vendor CEO}} (Seal/Signature)[EMP-P1-20] Scope of Work Freeze Agreement (Scope Freeze Sign-off #1) Full Markdown Text
# Scope of Work Confirmation & Requirements Freeze Agreement (Scope Freeze Sign-off)
- Document Code: `EMP-P1-20` | Version: `v2.0` | Official Gate: **Sign-off #1**
- Engagement Name: {{Project Name}} (Contract No.: {{Contract No.}})
- Client / Contractor: {{Client Name}} / Empasy Inc.
### 1. Baseline Deliverables Confirmed
- Software Requirements Specification (`EMP-P1-13` v1.0, Total {{Requirement Count}} items)
- Requirements Traceability Matrix (`EMP-P1-14` v1.0, bidirectional WBS, design, and test mapping)
- Internal/External Interface Specification Pre-Agreement (`EMP-P1-19` v1.0)
### 2. Four Principles of Scope Freeze
1. **Finality of Scope**: Only items registered in the confirmed Software Requirements Specification (`EMP-P1-13`) are finalized as the official development scope of this Engagement.
2. **Invalidation of Verbal Requests**: After the date of this Agreement, verbal instructions given via meetings or messengers shall have no contractual effect whatsoever.
3. **Change Control (CR) Linkage**: Any scope change requires submitting an official Change Request (`EMP-P3-10`). Work **exceeding 3 M/D** (5 M/D where stipulated in large-scale contracts) shall commence only after agreeing on a low-priority feature swap, schedule extension, or contract price adjustment.
4. **Approval to Enter Next Phase**: The Client officially approves entry into **Phase 2: Design & Specification**.
---
**Agreement Date: {{YYYY}}-{{MM}}-{{DD}}**
- **[Client Business Lead]**: {{Client Name}} {{Department}} {{Client Business PM}} (Seal/Signature)
- **[Client IT Lead]**: {{Client Name}} {{IT Department}} {{Client IT Lead}} (Seal/Signature)
- **[Contractor Project Lead]**: Empasy Inc. Lead PM {{Vendor Lead PM}} (Seal/Signature)[EMP-P3-10] Change Request Form (CR Form) Full Markdown Text
# Change Request Form (CR Form)
- Document Code: `EMP-P3-10` | Version: `v2.0`
### 1. Basic Change Request Information
- CR No.: `CR-{{YYYY}}-{{Seq}}`
- Request Date / Requesting Dept / Requester: {{YYYY-MM-DD}} / {{Requesting Dept}} / {{Requester}}
- Change Type: `[ ] New Feature Addition` / `[ ] Existing Spec Modification` / `[ ] Interface/Policy Change`
### 2. Change Details
- **Background & Rationale**: {{Describe rationale for change}}
- **Before (As-Is)**: {{Confirmed Existing Requirement/Design}}
- **After (To-Be)**: {{Requested Change Specification}}
### 3. Quantitative Impact & Effort Analysis (Completed by Contractor)
- Affected DB Tables: {{N}} / Affected APIs & Modules: {{N}} / Affected Screens: {{N}}
- **Total Required Effort**: `{{Required_MD}} M/D` (Exceeds 3 M/D: `[ ] Yes (Exceeds)` / `[ ] No (Within 3 M/D)`)
- **Schedule & Cost Resolution**: `[ ] Feature Swap within Existing Schedule` / `[ ] Schedule Extension (+{{N}} days)` / `[ ] Additional Contract`
### 4. Final Review Decision
- Decision: `[ ] Approved` / `[ ] Conditionally Approved` / `[ ] Deferred to Next Phase` / `[ ] Rejected`
- **[Client PM]**: {{Client Business PM}} (Signature) | **[Contractor PM]**: {{Vendor Lead PM}} (Signature)[EMP-P5-12] Final Acceptance Certificate & Handover Receipt (Sign-off #4) Full Markdown Text
# Final Acceptance Certificate & System Handover Receipt (Final Acceptance Sign-off)
- Document Code: `EMP-P5-12` | Version: `v2.0` | Official Gate: **Sign-off #4 (Basis for Final Balance Billing)**
### 1. Engagement & Contract Information
- Project Name / Contract No.: {{Project Name}} / {{Contract No.}}
- Contract Period: {{Start Date}} ~ {{Completion Date}}
- Total Contract Amount: KRW {{Total Contract Amount}} (VAT included)
- Final Balance Accepted Now: KRW {{Final Balance Amount}} (30% final balance — 100% cumulative acceptance)
### 2. Delivered Artifacts & Quality Inspection Breakdown
- `[x]` Initiation & Management Artifacts (PMP, WBS, Meeting Minutes, Issue/Defect/Change Registers) — Passed
- `[x]` Analysis & Design Artifacts (SRS, RTM, Screen Design Spec, SAD, DB Spec, Interface Spec) — Passed
- `[x]` Implementation, Test & Security Artifacts (Source Code, Unit/Integration Tests, MOIS & KISA 49 Security Rules, OSS, AI Golden-Set) — Passed
- `[x]` Cutover, Training & Manuals (Migration Reconciliation, User/Admin Manuals, Training Results, Handover Plan) — Passed
### 3. Final Verdict & Commencement of Defect Warranty
- **Final Verdict**: `[ PASSED (Final Acceptance Passed) ]`
- **Free Defect Warranty Period (1 Year)**: {{Warranty Start Date}} ~ {{Warranty End Date}}
**Acceptance Completion Date: {{YYYY}}-{{MM}}-{{DD}}**
- **[Client Representative / Inspector]**: {{Client Name}} CEO {{Client CEO}} (Official Seal)
- **[Contractor Representative]**: Empasy Inc. CEO {{Vendor CEO}} (Official Seal)[EMP-C0-08] Standard Outsourced Development Subcontract Agreement Full Markdown Text
# Standard Software Development Subcontract Agreement
- Document Code: `EMP-C0-08` | Version: `v2.0`
Empasy Inc. (hereinafter "Party A") and {{Subcontractor Name}} (hereinafter "Party B") enter into this Subcontract Agreement for the completion and delivery of "{{Subcontracted Scope Name}}" within "{{Project Name}}" (hereinafter the "Services") as follows.
### Article 1 (Purpose & Scope of Work)
Party B shall complete and deliver the software development scope in accordance with the functional specifications and schedule ({{Start Date}} ~ {{End Date}}) set forth in the attached Statement of Work (`EMP-C0-11` SOW).
### Article 2 (Subcontract Fee & Payment Terms — Total KRW {{Subcontract Amount}}, VAT included)
1. **Advance Payment (30%)**: Paid in cash within 15 days after contract execution and submission of kickoff notice and surety bond.
2. **Interim Payment (40%)**: Paid upon completion of DEV environment implementation and passing unit test inspection.
3. **Final Balance (30%)**: Paid within 14 days of passing final integration test acceptance (`EMP-C0-12`) and receiving the tax invoice.
### Article 3 (Full Assignment of Intellectual Property & Waiver of Moral Rights)
All economic copyrights (including derivative works rights) in the source code and all deliverables developed by Party B under this Agreement shall be exclusively assigned to Party A upon payment, and Party B shall not exercise moral rights.
### Article 4 (Strict Prohibition of Re-Subcontracting)
Pursuant to Article 51 of the Software Promotion Act, Party B may not re-subcontract any part of this scope to a third party without the prior written approval of Party A and the Client.
### Article 5 (Defect Warranty & Back-to-Back Liquidated Damages)
1. Party B shall bear free defect warranty responsibility for defects in delivered artifacts for **one (1) year** from the date of final acceptance.
2. In the event of delayed delivery, **0.075%** of the subcontract amount per day of delay shall be deducted as liquidated damages.
**Execution Date: {{YYYY}}-{{MM}}-{{DD}}**
- **[Party A]**: Empasy Inc. CEO {{Vendor CEO}} (Seal/Signature) | **[Party B]**: {{Subcontractor Name}} CEO {{Subcontractor CEO}} (Seal/Signature)[EMP-C0-09] Freelancer Service Entrustment Agreement (3.3%) Full Markdown Text
# Software Freelancer Service Entrustment Agreement
- Document Code: `EMP-C0-09` | Version: `v2.0`
Empasy Inc. (hereinafter the "Company") and independent professional freelancer {{Contractor Name}} (hereinafter the "Contractor") enter into this Service Entrustment Agreement for the completion and delivery of "{{Entrusted Scope Name}}" as follows.
### Article 1 (Confirmation of Independent Contractor Status — Explicit Exclusion of Employment)
1. Both Parties confirm that the Contractor is an independent sole proprietor completing deliverables based on independent professional expertise and is not an employee under the Labor Standards Act.
2. Provided that security policies are observed and milestone delivery schedules are met, the Contractor retains autonomous discretion over working hours and work location, and the Company exercises no attendance or time-clock supervision.
3. Upon payment of service fees, **3.3% business income tax shall be withheld** under applicable tax law, and the Contractor is not eligible for the four major social insurances or severance pay.
### Article 2 (Entrustment Period, Fee & Deliverable Acceptance)
- Entrustment Period: {{Start Date}} ~ {{End Date}}
- Total Service Fee: KRW {{Total Amount}} (gross amount before withholding tax)
- Acceptance & Payment: Paid in monthly installments on day {{Payment Day}} of each month after passing unit tests and deliverable acceptance against the Statement of Work (SOW).
### Article 3 (Intellectual Property Ownership & Security Obligations)
1. All economic copyrights (including derivative works rights) in source code and documents produced under this Agreement shall vest fully in the Company upon payment.
2. The Contractor shall not export source code to external personal repositories and shall permanently destroy all local files immediately upon completion of the scope.
**Execution Date: {{YYYY}}-{{MM}}-{{DD}}**
- **[Company]**: Empasy Inc. CEO {{Vendor CEO}} (Seal/Signature) | **[Contractor]**: {{Contractor Name}} (DOB: {{YYMMDD}}) (Seal/Signature)4. Enterprise Standard Formatting & Retention Rules
- Compliance with the 90-8-2 Document Visual Standard:
- Do not add arbitrary primary-color or fluorescent cell fills or colored sheet tabs; preserve the embedded Empasy theme (
Empasy 90-8-2 Minimal) and theMalgun Gothictypeface.
- Do not add arbitrary primary-color or fluorescent cell fills or colored sheet tabs; preserve the embedded Empasy theme (
- Compliance with Electronic Signatures & Corporate Seal Execution:
- Legally binding templates (NDAs, contracts, the 4 Sign-offs, payment invoice letters, and subcontract/freelancer agreements) must be executed with the CEO's corporate seal or a certified electronic signature service (such as Modusign).
- 5-Year Statutory Document Retention & Audit Readiness:
- To prepare for tax, Software Promotion Act, and AI Basic Act audits, archive all contracts, acceptance certificates, security records, and AI evaluation evidence permanently for at least 5 years from the project completion date.