Skip to content

[Phase 04] Practical Guide to Test Automation and 4-Cycle Auto-Repair ​

Phase Summary: Automatically generate unit and integration tests for the implemented code, execute the enterprise-standard 4-Cycle regression verification (Compilation -> Interface -> Logic -> Clean Build), and run automated error repair (autoRepairCode) where AI analyzes error logs and fixes code upon failure.


1. Phase Objective and Audience ​

  • Primary Owners: QA Engineer, Software Test Engineer, Backend/Frontend Developer
  • Collaborators: System Architect, Release Manager
  • Estimated Duration: Approximately 30 to 45 minutes per feature
  • Tools Used: Maven / Gradle, JUnit 5, MockMvc, Vitest, SyncVerse Self-Healing Engine

2. Pre-Start Checklist (Entry Criteria) ​

Verify the following items before starting this phase:

  • Has [Phase 03] code implementation been completed and passed initial local compilation?
  • Have the per-scenario completion criteria (acceptance criteria) from the [Phase 01] functional specification been confirmed?
  • Is the test database or test container environment ready?

3. Practical 4-Cycle Verification and Auto-Repair Workflow ​

[Cycle 1] Static Zero-Mock Audit and Source Code Compilation Verification ​

  • Pass static integrity checks (verify-hardcoded-smells, verify-zero-mock), then execute mvn compile and mvn test-compile (pnpm build and type checks for frontend) to block syntax errors, type mismatches, and dummy code violations upfront.

[Cycle 2] Interface Contract and Security Secret Cross-Verification ​

  • Verify 1:1 alignment (verify-api-contracts) between the OpenAPI specification defined upfront in Phase 02 and frontend-backend /api/v1/ URLs, confirm zero plaintext secrets (verify-security-leaks), and inspect against the 49 MOIS/KISA secure software development weaknesses.

[Cycle 3] Exception Case Unit/Integration Testing and AI Golden-Set Evaluation ​

  • In addition to normal execution paths, run isolated unit tests (JUnit 5 / Vitest) for exception scenarios (expiration, insufficient balance, duplicate requests). When AI/LLM features are included, perform precision and recall regression evaluation against the 50-question standard golden set (EMP-P4-09).

[Cycle 4] Final Clean Packaging and Independent QA Cross-Audit ​

  • Clear previous build caches and run mvn clean package, then have an independent QA subagent (or cross-reviewer) cross-audit the modified files and Requirements Traceability Matrix (RTM) to issue the final pass verdict.

Auto-Repair Loop (autoRepairCode) ​

  • If an error occurs during verification, the system analyzes the error log to identify the root cause and automatically repairs the code.
  • To prevent infinite loops, auto-repair is attempted up to 3 times; if failures exceed 3 attempts, the process safely halts and requests developer intervention.

4. Practical Prompt Examples (Copy and Use) ​

Prompt 1: Automated Generation of Exception Case Unit Tests (JUnit 5) ​

markdown
[Role] Senior QA Engineer & Backend Testing Specialist
[Context] Please write a JUnit 5-based unit test class for the business service code below.
[Code Under Test]
{{Service or Controller source code implemented in Phase 03}}
[Completion Criteria]
{{Situation-Action-Result scenarios derived in Phase 01}}

[Writing Rules]
1. In addition to normal execution cases, write individual @Test methods for the following exception scenarios:
   - Attempt to apply an expired coupon -> Verify the appropriate business exception is thrown
   - Attempt below minimum order amount -> Verify validation failure exception
   - Passing a non-existent ID -> Verify resource-not-found exception
   - Concurrent duplicate application by the same member -> Verify duplicate blocking
2. Use AssertJ (assertThat, assertThatThrownBy) to write clear, readable assertions.
3. Clearly state the test objective in @DisplayName.

Prompt 2: Automated Build Error Repair (autoRepairCode) ​

markdown
[Role] Software Debugging & Error Remediation Agent
[Context]
During build verification, the following compilation or test error occurred. Fix the error while preserving existing business policies.

[Error Log]
{{Build error stack trace content}}

[Failing Source Code]
{{Source code content of the affected file}}

[Writing Rules]
1. Root Cause Analysis: Summarize the core cause of the error in 2 lines or fewer.
2. Side-Effect Check: Confirm that the fix does not negatively impact other components.
3. Replacement Code: Provide the complete file content ready for direct replacement.
   - [Caution] Do not arbitrarily delete required validation statements (if checks) just to resolve the error.
   - [Caution] Do not leave method bodies empty (// TODO).

5. Common Mistakes and Precautions ​

Mistake TypeCommon IssueRecommended Mitigation
Tests Without AssertionsWriting fake tests that only invoke a method without verifying results, causing them to always passEnsure every test method includes at least two result assertions (assertThat).
Arbitrarily Deleting Validation LogicRemoving essential service validation checks just to make tests passInstruct the repair process to preserve business validation checks while aligning types or parameters.
Infinite Repair RetriesWasting time by endlessly rebuilding even when errors persistCap maximum retries at 3 and escalate to manual developer intervention if exceeded.

6. Phase Completion Checklist (Exit Criteria) ​

Verify the following items before proceeding to Phase 05: Code Review and Autonomous Deployment:

  • [ ] Have all 4-Cycle Zero-Mock verifications (static/compilation, API contract & security, unit/integration/AI golden set, clean packaging & independent QA audit) passed?
  • [ ] Have isolated unit tests for major exception scenarios been written and executed successfully?
  • [ ] If auto-repair was triggered, does the repaired code preserve the original design intent?
  • [ ] Are the build artifacts (such as JAR files) packaged properly?

Linked Official Deliverables (Phase 4) ​

  • [EMP-P4-02] Unit Test Cases · [EMP-P4-04] Integration Test Scenarios & Results · [EMP-P4-06] 49 SW Secure Development Checklist (MOIS/KISA) · [EMP-P4-07] Open Source License Verification Report · [EMP-P4-09] AI Golden-Set Quality Evaluation Report · [EMP-P4-11] UAT Confirmation Certificate -> Go to Standard Template Download Center