Empasy Phase-by-Phase Action Items (45 Action Items) & Operational Execution Guide (SOP)
Overview: This guide is the enterprise Standard Operating Procedure (SOP) defining what (
Action Item) each owner executes, in what sequence, which official template (EMP-*) to produce, and how to determine pass/fail acceptance at every stage from Phase 0 (Pre-Sales) to Phase 5 (Go-Live & Settlement).
Related Parent & Practitioner Guides
- Empasy Business & Project Management Standard Document Template Download Center (125 Templates): 90-8-2 enterprise standard format featuring 125 single master (Blank) templates + 6 scale-based preset packages
- Empasy Business & Development Methodology Overview (Phase 0–5): Full-lifecycle governance, 4 major Sign-offs, and S/M/L Tailoring criteria
- Empasy Full-Lifecycle Standard Document System & Delivery/Management Guide: Public sector, finance, and AI Basic Act regulations, AI FinOps, outsourcing, and crisis response standards
- Pre-Sales & Proposal Support Playbook (Pre-sales): RFP analysis, proposal drafting, PoC demo creation, and effort estimation
- Development Lifecycle Overview (AI-SDLC): Detailed 5-stage development process
- Situational Practical Prompt Collection (Cheat Sheet): Ready-to-copy prompt templates by execution stage
1. Overview of All 45 Action Items Across Phase 0 – Phase 5
2. Detailed Operational Guide by Phase and Action Item
[Phase 0] Pre-Sales & Proposal Support (7 Items)
Action Item A0.0: Bid Feasibility Review (Go / No-Go) & Non-Disclosure Agreement (NDA) Execution
- Objective: Prevent under-qualified or loss-making bids upfront and establish legal confidentiality and prohibition of external AI training prior to receiving client source materials.
- Owner: Business Division Head, Account Executive, Proposal Technical PM, Legal Counsel
- Execution Procedure:
- Execute a Mutual Non-Disclosure Agreement (NDA) before receiving detailed client RFP documents or data.
- Quantitatively score technical fit (30 pts), profitability (25 pts), schedule feasibility (20 pts), asset reuse rate (15 pts), and contractual/security risk (10 pts).
- Approve bid participation (Go) when the total score is 70 points or higher; decide against bidding (No-Go) if below threshold.
- Standard Deliverables: EMP-P0-01 Mutual Non-Disclosure Agreement (NDA), EMP-P0-02 Bid Feasibility Go/No-Go Review Sheet
- Acceptance Criteria: Is the NDA fully executed with official seals, and has formal bid participation been approved with a Go/No-Go total score of 70 points or above?
Action Item A0.1: RFP Requirement Decomposition & Pre-Bid Clarification
- Objective: Extract Functional (SFR), Data (DAR), Interface (SIR), and Non-Functional (NFR) requirements without omission from multi-hundred-page RFPs.
- Owner: Pre-Sales Engineer, Proposal Technical PM
- Execution Procedure:
- Structure RFP requirements by unique ID, category, and difficulty level (High/Medium/Low).
- Compile ambiguous constraints and legacy integration scopes into a Pre-Sales Client Inquiry Sheet to obtain contracting authority clarification.
- Standard Deliverables: EMP-P0-03 Pre-Sales Client Inquiry Sheet, EMP-P0-08 Pre-Sales Technical Proposal Direction Brief
- Acceptance Criteria: Are all requirement items in the original RFP classified without omission, and have all key issues been identified?
Action Item A0.2: Business Technical Proposal Authoring
- Objective: Demonstrate differentiation in the target system's 4-tier architecture, security/quality assurance, and execution methodology.
- Owner: Solution Architect, Proposal PM
- Execution Procedure:
- Assign section owners and review schedules according to the Detailed Proposal Work Plan.
- Document the architecture diagram, Spec-First methodology, 4-Cycle Zero-Mock quality verification, and AI governance strategy.
- Standard Deliverables: EMP-P0-07 Detailed Proposal Work Plan, EMP-P0-09 Standard Business Technical Proposal Template
- Acceptance Criteria: Does the proposal satisfy all mandatory client constraints and evaluation scoring items?
Action Item A0.3: Sales Demo PoC Creation & Technical Verification Results Report
- Objective: Secure a technical evaluation advantage by demonstrating 1–2 live, working core screens during the proposal presentation (PT).
- Owner: Prototype Developer, Frontend & AI Engineer
- Execution Procedure:
- Select 1–2 core screens of highest client interest and build a working prototype using internal standard components (
Vben BasicModal, etc.). - Summarize empirical metrics such as accuracy and response latency and deliver them to the Account Executive.
- Select 1–2 core screens of highest client interest and build a working prototype using internal standard components (
- Standard Deliverables: Live demo URL, EMP-P0-08 Pre-Sales Technical Proposal Direction Brief
- Acceptance Criteria: Do click actions, queries, and AI analysis operate cleanly without errors in the demonstration environment?
Action Item A0.4: Official Quote, 3-Year TCO Cost Calculation & Execution Budget Estimation
- Objective: Secure target profit margins by calculating labor costs, cloud/GPU infrastructure, commercial LLM tokens, and outsourcing expenses together.
- Owner: Proposal PM, Account Executive, Development Lead
- Execution Procedure:
- Calculate required effort (M/M) based on feature complexity alongside a 3-year TCO for infrastructure and LLM tokens.
- Apply the target operating profit margin over internal cost to finalize the Official Quote and Execution Budget.
- Standard Deliverables: EMP-P0-04 3-Year TCO Cost Calculation Sheet, EMP-P0-05 Contract Award Execution Budget, EMP-P0-06 Standard SW Development Quote
- Acceptance Criteria: Is the project executable within available staffing and timeline while meeting the target profit margin?
Action Item A0.5: Bid Participation Package Preparation & Proposal PT Q&A Defense Simulation
- Objective: Prevent bid disqualification and prepare logical defenses against the top 10 tough evaluator questions.
- Owner: Business Support Team, Pre-Sales, Proposal Presenter
- Execution Procedure:
- Prepare the corporate seal certificate, national/local tax clearance certificates, credit rating report, past performance certificates, and bid guarantee insurance policy.
- Rehearse a 3-step defense script (
Principle -> Technical Solution -> Verified Track Record) for the top 10 frequent evaluator questions.
- Standard Deliverables: Full bid qualification document set, EMP-P0-10 Proposal PT Evaluation Slide Deck
- Acceptance Criteria: Are all administrative documents within validity periods with official seals complete, and is the top 10 Q&A defense fully rehearsed?
Action Item A0.6: Pre-Execution Technical Feasibility Agreement (Technical Sign-off)
- Objective: Prevent reckless low-price or compressed-schedule bids without engineering validation.
- Owner: Development Lead (Tech Lead), Business Division Head
- Execution Procedure:
- Prior to bid submission, the Development Lead conducts a final review of effort, delivery timeline, technical specifications, and AI SLA feasibility.
- Upon confirming feasibility, sign the Pre-Execution Technical Approval form.
- Standard Deliverables: EMP-P0-11 Pre-Execution Technical Feasibility Approval
- Acceptance Criteria: Has formal written sign-off from the Development Lead been secured?
[Phase 1] Contract Execution, Kickoff & Requirements Analysis (Inception & SRS — 8 Items)
Action Item A1.0: Main Contract Execution, Surety Bonds, Advance Payment & Subcontract Approval, and Kickoff Filing
- Objective: Finalize legal rights and obligations, secure early advance payment (30–50%), and submit formal kickoff notification.
- Owner: Business Representative, Sales/Legal, PM, Business Support Team
- Execution Procedure:
- Execute the standard contract specifying payment milestones (30/40/30), liquidated damages (0.075%), intellectual property rights, and warranty period (1 year).
- Issue the contract performance bond insurance policy and file the Kickoff Report and Advance Payment Request (including advance payment bond).
- When deploying external subcontractors, submit the Pre-Subcontract Approval Application (within 50% cap, sub-subcontracting prohibited) pursuant to Article 51 of the Software Promotion Act.
- Standard Deliverables: EMP-P1-01 Standard SW Service Contract, EMP-P1-02 Kickoff Notice & PMP, EMP-P1-06 Advance Payment Request, EMP-P1-07 Pre-Subcontract Approval Application
- Acceptance Criteria: Are bilateral contract seals, surety bond issuance, Kickoff Notice, and advance payment request all completed?
Action Item A1.1: Project Management Plan (PMP) Confirmation, Security Pledges & AI Basic Act Governance Check
- Objective: Obtain Kickoff Briefing approval, enforce personnel security compliance, and proactively verify 2026 AI Basic Act requirements.
- Owner: Lead PM, Security Officer, AI Lead
- Execution Procedure:
- Confirm the project organization, contact directory, recurring meeting cadence, and standard folder structure through the Kickoff Briefing and workshop.
- Collect Security Pledges and Personal Information Processing Consignment Agreements from all assigned staff; for AI-enabled projects, check all 18 items including High-Impact AI classification, exclusion from external model training, and PII masking.
- Standard Deliverables: EMP-G0-01 Standard Folder Structure, EMP-P1-04 Kickoff Briefing Presentation, EMP-P1-08 Security Pledge & Consignment Agreement, EMP-P1-09 Contact Directory & Meeting Cadence, EMP-P1-22 AI Governance Checklist
- Acceptance Criteria: Has the Kickoff Briefing been approved, have all team members submitted security pledges, and is the initial AI governance check complete?
Action Item A1.2: Software Requirements Specification (SRS) & Traceability Matrix (RTM) Confirmation
- Objective: Establish a 1:1 mapping between proposal commitments and actual implementation scope using unique IDs.
- Owner: PM, BA/Planner, Client Business PM
- Execution Procedure:
- Conduct stakeholder interviews, environment analysis, benchmarking, and AS-IS process diagnostics.
- Finalize functional, data, integration, and security requirements in the SRS, and agree on the bidirectional RTM and Enterprise System Interface Specification Agreement.
- Standard Deliverables: EMP-P1-13 Software Requirements Specification (SRS), EMP-P1-14 Requirements Traceability Matrix (RTM), EMP-P1-16 Environment Analysis Report, EMP-P1-18 AS-IS Process Definition, EMP-P1-19 Interface Specification Agreement
- Acceptance Criteria: Does every requirement have a unique ID and acceptance criterion, and has client operational review been completed?
Action Item A1.3: Proactive Business Exception Policy Discovery & Stakeholder Interviews
- Objective: Prevent frequent mid-development policy changes and rework upfront.
- Owner: Service Planner, BA
- Execution Procedure:
- Prepare an edge-case questionnaire covering cancellations, refunds, expirations, concurrent requests, and permission boundaries, and conduct interviews with client business owners.
- Finalize the delivery schedule for client-supplied text, images, and master data.
- Standard Deliverables: EMP-P1-15 Requirements Questionnaire & Content Supply List, EMP-P2-03 Operations Policy Definition
- Acceptance Criteria: Have major exception-handling policies beyond the happy path and the content delivery schedule been agreed upon in writing?
Action Item A1.4: Master WBS & Milestone Baseline Confirmation
- Objective: Establish full-lifecycle work breakdown, weighted progress criteria, and sprint planning.
- Owner: Lead PM, Tech Lead
- Execution Procedure:
- Finalize the WBS based on the RTM, incorporating granular Phase 0–5 tasks, weights (summing to 100%), and public holiday calendars.
- Agree with the contracting authority on the scale-based Tailoring deliverables list and key milestones.
- Standard Deliverables: EMP-P1-10 Master WBS, EMP-P1-11 Milestone Summary, EMP-P1-12 Scope & Deliverables List
- Acceptance Criteria: Has the 100% weight sum been verified and the overall schedule baseline agreed upon?
Action Item A1.5: Scope Change Management (CR 3 M/D Threshold) Governance Setup
- Objective: Prevent margin erosion caused by verbal requests and uncontrolled Scope Creep.
- Owner: Lead PM, Client PM
- Execution Procedure:
- Establish an agreement rejecting verbal requests and requiring formal written submission via the CR Form.
- Codify the rule that changes exceeding 3 M/D in impact analysis (5 M/D under large-contract special terms) must trigger feature swapping, schedule extension, or an addendum contract.
- Standard Deliverables: EMP-P3-10 Change Request Form (CR Form), EMP-P3-11 Cumulative Change Management Register
- Acceptance Criteria: Have change control thresholds and approval procedures been formally agreed upon in writing with the client?
Action Item A1.6: Legacy Data Migration Early Validation
- Objective: Prevent go-live delays caused by missing data or format mismatches discovered right before launch.
- Owner: Data Engineer, DBA
- Execution Procedure:
- Extract legacy DB samples in Week 2–3 after kickoff and validate transformation into the target schema early.
- Formally notify the client's IT department of identified missing values and code errors to drive pre-launch data cleansing.
- Standard Deliverables: EMP-P1-19 Internal/External Interface Specification Agreement, EMP-P5-04 Data Migration Reconciliation Table (Draft)
- Acceptance Criteria: Has sample transformation testing been completed and have erroneous records requiring cleansing been identified early?
Action Item A1.7: Scope Baseline Agreement Signing (Sign-off #1 — Scope Freeze)
- Objective: Formally close Phase 1 and legally freeze the development scope.
- Owner: Lead PM, Client Business & IT Executives
- Execution Procedure:
- Submit the scope freeze approval package attaching the confirmed SRS (
EMP-P1-13), RTM (EMP-P1-14), and Interface Specification Agreement (EMP-P1-19). - Obtain official seals/signatures from both parties' executives and receive authorization to enter Phase 2.
- Submit the scope freeze approval package attaching the confirmed SRS (
- Standard Deliverables: EMP-P1-20 Scope Baseline Scope Freeze Agreement
- Acceptance Criteria: Have original signed copies from executive leads of both organizations been secured?
[Phase 2] Spec-First Architecture & Detailed Design (Design & Spec — 7 Items)
Action Item A2.0: UI/UX Storyboard Specification & Client Approval (Sign-off #2)
- Objective: Freeze UI/UX specifications reviewable by business users in writing prior to coding to eliminate rework.
- Owner: UI/UX Planner, Designer, Client Business Team
- Execution Procedure:
- Author the Information Architecture (IA), Unit Function Definitions, TO-BE Processes, Design Strategy, and Screen Storyboards.
- Conduct business user walkthroughs and obtain formal sign-off on screen counts, layouts, and interactions.
- Standard Deliverables: EMP-P2-01 Information Architecture (IA), EMP-P2-02 Unit Function Definition, EMP-P2-06 Screen Design Storyboard, EMP-P2-07 Design Strategy, EMP-P2-10 Screen Design Approval Confirmation
- Acceptance Criteria: Are all menu screen designs complete and has formal client approval (Sign-off #2) been obtained?
Action Item A2.1: System Architecture Design (SAD) & Cloud/Firewall Request Confirmation
- Objective: Resolve infrastructure bottlenecks by confirming server sizing, network segregation zones, and firewall port policies early.
- Owner: Infrastructure Architect (AA), Client IT Infrastructure Team
- Execution Procedure:
- Design the DEV/STG/PRD 3-tier topology, container architecture (EKS/Docker), HA/backup strategy, and security architecture.
- Submit source/destination IP and port firewall opening requests to the client security team early.
- Standard Deliverables: EMP-P2-11 System Architecture Document (SAD), EMP-P2-12 Architecture Diagram, EMP-P2-13 Cloud & Firewall Request Form
- Acceptance Criteria: Have server, network, and firewall specifications been agreed upon with the infrastructure and security teams?
Action Item A2.2: Data Standardization, 6-File PostgreSQL DDL & 9-Sheet DB Specification Confirmation
- Objective: Complete audit-mandatory data standardization deliverables and eliminate SQL conflict errors at the source.
- Owner: Data Architect (DA), DBA
- Execution Procedure:
- Author standard terminology, common codes, logical/physical data models, the 9-Sheet DB Specification, and the CRUD Matrix.
- Write the 6-stage pure SQL scripts (
00_extensions.sqlthrough05_sample_dev.sql, strictly prohibitingON CONFLICT) in<SubProject>/db/and verify clean single-pass execution.
- Standard Deliverables: EMP-P2-17 Standard Terminology Definition, EMP-P2-18 Common Code Definition, EMP-P2-19 Logical & Physical Data Model, EMP-P2-20 9-Sheet DB Specification, EMP-P2-21 CRUD Matrix
- Acceptance Criteria: Do the 6-stage SQL scripts initialize cleanly on the first run without errors on local PostgreSQL 18.6?
Action Item A2.3: Unified Canonical REST API, Batch & AI Prompt Design Confirmation
- Objective: Freeze interface contracts for parallel backend, frontend, and AI development.
- Owner: Backend Lead, Frontend Lead, AI Engineer
- Execution Procedure:
- Finalize all APIs under the unified
/api/v1/{product}/{resource}standard path and OpenAPI 3.0 specification. - Design scheduled batch jobs (dependencies and retry handling) as well as AI inference pipelines and JSON output schemas.
- Finalize all APIs under the unified
- Standard Deliverables: EMP-P2-22 Interface & API Specification, EMP-P2-23 Batch Program Design Specification, EMP-P2-24 AI Inference & Prompt Design Specification
- Acceptance Criteria: Is unified URL standard compliance verified and has contract review across frontend, backend, and AI teams completed?
Action Item A2.4: Enterprise Development Standards Definition & Agent Common Rules (.agents/AGENTS.md) Distribution
- Objective: Enforce uniform compliance with 2026 enterprise standards across all team members and coding agents.
- Owner: Architect, Tech Lead
- Execution Procedure:
- Define Java 25, Spring Boot 4.0, AgentScope Java, Lombok, Vue 3 Vben standards, and Zero-Mock rules.
- Commit
.agents/AGENTS.mdand IDE rule files to the repository root to distribute across all development environments.
- Standard Deliverables: EMP-P2-15 Development Standards & Environment Definition, repository
.agents/AGENTS.md - Acceptance Criteria: Do coding agents and CI verification scripts automatically enforce the enterprise standard rules?
Action Item A2.5: External Integration System Virtualization (Mock Server) Pre-Build
- Objective: Eliminate internal development idle bottlenecks caused by external agency or legacy network opening delays.
- Owner: Backend Integration PL
- Execution Procedure:
- Stand up a Mock Server simulating normal, timeout, and error responses based on the Interface Specification (
EMP-P2-22). - Decouple integration adapters so switching to live integration requires only updating an environment variable endpoint when the production network opens.
- Stand up a Mock Server simulating normal, timeout, and error responses based on the Interface Specification (
- Standard Deliverables: Mock Server configuration files, EMP-P2-16 Software Component Design Specification
- Acceptance Criteria: Do local/dev E2E scenarios run independently even while external networks remain closed?
Action Item A2.6: Design Phase Completion Report & Development Entry Approval
- Objective: Freeze all Phase 2 design deliverables and lock module-by-module development schedules.
- Owner: Lead PM, Client PM
- Execution Procedure:
- Conduct a consolidated review of UI, SAD, DB, API, and AI design deliverables and finalize the Module-Level Development Schedule Plan.
- Obtain design completion sign-off and enter the Phase 3 implementation stage.
- Standard Deliverables: EMP-P2-10 Screen Design Approval Confirmation, EMP-P2-25 Module-Level Development Schedule Plan
- Acceptance Criteria: Are key design deliverables approved and are development sprint backlogs assigned?
[Phase 3] AI-Collaborative Implementation, Progress & Change Control (Implementation & Control — 7 Items)
Action Item A3.1: Scoped File Modification (focusFiles) Isolation
- Objective: Prevent unintended side effects on unrelated modules or configuration files outside the assigned unit task.
- Owner: All Developers
- Execution Procedure:
- Before starting a feature ticket, explicitly isolate the target file list (
Controller,Service,Modal.vue, etc.). - Upon completion, run
git statusandgit diffto verify there are zero out-of-scope modifications.
- Before starting a feature ticket, explicitly isolate the target file list (
- Standard Deliverables: Per-ticket
focusFileslist and isolated PR branch - Acceptance Criteria: Are there zero unnecessary modifications outside the designated working files?
Action Item A3.2: Backend & AgentScope Java Standard Implementation (Zero-Mock Compliance)
- Objective: Achieve 100% live integration with actual PostgreSQL 18.6 and AI pipelines without dummy data or fake fallbacks.
- Owner: Backend Developer, AI Engineer
- Execution Procedure:
- Enforce Lombok (
@RequiredArgsConstructor,@Slf4j), unified/api/v1/URLs, and decoupling of external LLM calls outside@Transactional. - Implement live integrations for the AI business rules dictionary, prompt specifications, and legacy DB integration adapters.
- Enforce Lombok (
- Standard Deliverables: Standards-compliant backend source code, EMP-P3-14 REST API Manual, EMP-P3-15 AI Rules Dictionary, EMP-P3-16 AI Prompt Specification, EMP-P3-17 Legacy DB Integration Specification
- Acceptance Criteria: Are there zero Mock/Stub patterns or fake exception fallbacks, and do live DB and AI pipelines operate normally?
Action Item A3.3: Frontend Vben Standards & Independent Modal Component Separation
- Objective: Ensure UI consistency, maintainability, and DB-driven dynamic permission control.
- Owner: Frontend Developer
- Execution Procedure:
- Use Vben standard components (
BasicTable,BasicForm,BasicModal, etc.) and extract modals into standalonecomponents/<Name>Modal.vuefiles. - Prohibit static route hardcoding and map routes 1:1 with
sys_permissionin04_seed_domain.sql.
- Use Vben standard components (
- Standard Deliverables: Independently separated Vue 3 components and dynamic menu seeds
- Acceptance Criteria: Are there zero raw inline modals or hardcoded static menus, and does the UI communicate properly with live APIs?
Action Item A3.4: Weekly & Monthly Progress Reporting and Effort/Cost Control
- Objective: Regularly track actual vs. planned progress (S-Curve) and budget burn rate to recover schedule slippage early.
- Owner: Lead PM, PMO
- Execution Procedure:
- Submit Weekly Status Reports and official meeting minutes every week, and deliver Monthly Progress Reports, monthly effort logs, and cost management ledgers every month.
- Whenever actual progress deviates from plan by
-5%por worse, establish an immediate recovery plan.
- Standard Deliverables: EMP-P3-01 Weekly Status Report, EMP-P3-02 Monthly Progress Report, EMP-P3-04 Standard Meeting Minutes (3 Types), EMP-P3-06 Monthly Effort Report, EMP-P3-07 Cost Management Ledger
- Acceptance Criteria: Are weekly and monthly reports submitted without omission, and is schedule variance within controlled thresholds?
Action Item A3.5: Issue/Risk Register & Daily Defect Log Operation
- Objective: Track external integration delays, missing data, and implementation defects by severity to resolve them early.
- Owner: PM, Tech Lead, QA
- Execution Procedure:
- Classify all issues and risks as
High/Medium/Lowand manage owners, target resolution dates, and mitigation plans. - Log, fix, and retest defects immediately during Daily Check inspections of dev screens and features.
- Classify all issues and risks as
- Standard Deliverables: EMP-P3-08 Issue & Risk Register, EMP-P3-09 Daily Defect Management Log
- Acceptance Criteria: Are there zero overdue High-severity issues and zero unresolved critical defects?
Action Item A3.6: Change Request (CR Form) Processing & Extension of Time (EOT) Evidence
- Objective: Link additional requested effort to contract adjustments and secure legal immunity from liquidated damages for client-caused delays.
- Owner: Lead PM, Sales/Legal
- Execution Procedure:
- Upon receiving a change request, analyze quantitative impact (DB/API/UI/M/D) and obtain written agreement on scope swap, schedule adjustment, or contract amendment for items exceeding 3 M/D.
- When delayed by client firewall opening or data delivery, dispatch an official notice within 3 business days and apply for EOT under Article 74 of the Act on Contracts to Which the State is a Party.
- Standard Deliverables: EMP-P3-10 Change Request Form (CR Form), EMP-P3-11 Cumulative Change Management Register, EMP-P3-13 Extension of Time & Delay Waiver Evidence (EOT)
- Acceptance Criteria: Does every change task begin only after bilateral sign-off, and is delay evidence formally accumulated?
Action Item A3.7: Interim Report Demonstration & Progress Billing Inspection (40% Interim Payment)
- Objective: Incorporate business user feedback early via a live demo at the midpoint milestone and collect the interim milestone payment.
- Owner: Lead PM, Sales/Business Support Team
- Execution Procedure:
- Conduct an Interim Briefing featuring completed design deliverables and live demonstrations of core implemented modules.
- Submit the Progress Inspection Request, obtain the Progress Inspection Certificate, and invoice the interim milestone payment.
- Standard Deliverables: EMP-P3-03 Interim Report Presentation, EMP-P3-12 Progress Inspection Request
- Acceptance Criteria: Have the Interim Briefing approval and Progress Inspection Certificate been received?
[Phase 4] Quality Verification, Security & Audit (Verification, Security & Audit — 6 Items)
Action Item A4.1: 4-Cycle Zero-Mock Automated Regression Verification & Independent QA Cross-Audit
- Objective: Block 100% of static defects, interface mismatches, business logic flaws, and residual mocks prior to release.
- Owner: QA Engineer, Developers, Independent QA Auditor
- Execution Procedure:
- Cycle 1: Zero-Mock & hardcoded smell check +
mvn compile test-compile. - Cycle 2: Frontend–backend
/api/v1/API contract 1:1 cross-check + secret leak scan. - Cycle 3: JUnit 5 / Vitest isolated unit tests + E2E integration tests +
pnpm build. - Cycle 4: Clean packaging + independent QA cross-audit (against Traceability Matrix).
- Cycle 1: Zero-Mock & hardcoded smell check +
- Standard Deliverables: EMP-P4-01 Unit Test Plan, EMP-P4-02 Unit Test Cases, EMP-P4-03 Integration Test Plan, EMP-P4-04 Integration Test Scenarios & Results
- Acceptance Criteria: Are there zero 4-Cycle verification violations, 100% unit/integration test pass rates, and independent QA sign-off?
Action Item A4.2: Build Failure Self-Healing via autoRepairCode
- Objective: Rapidly recover from compilation and test errors using error logs while protecting business validation policies from degradation.
- Owner: Developer, Coding Agent
- Execution Procedure:
- Analyze build failure logs, generate patches that preserve core business validation assertions, and re-verify (up to 3 attempts).
- If failures exceed 3 attempts, halt execution and escalate to the assigned senior developer.
- Standard Deliverables: Auto-repaired patch commits and re-verification build logs
- Acceptance Criteria: Does the full 4-Cycle build succeed after remediation with all existing business validation policies intact?
Action Item A4.3: MOIS/KISA 49 Software Security Checks & OSS License Verification
- Objective: Prevent go-live holds caused by security vulnerabilities or copyleft open-source license contamination (such as GPL).
- Owner: Security Officer, Tech Lead
- Execution Procedure:
- Inspect and remediate all 49 security weaknesses in the Ministry of the Interior and Safety (MOIS) & Korea Internet & Security Agency (KISA) Software Development Security Guide.
- Generate an SBOM to verify open-source license compliance and produce the distribution notice (
NOTICE).
- Standard Deliverables: EMP-P4-06 49-Item SW Development Security Checklist, EMP-P4-07 Open-Source License Verification Certificate
- Acceptance Criteria: Are there zero Critical/High security weaknesses and zero GPL-family license conflicts?
Action Item A4.4: Performance Load Testing & Quantitative AI Golden-Set Quality Evaluation
- Objective: Prove target concurrency/latency SLAs and AI decision accuracy with objective metrics.
- Owner: Infrastructure/QA Lead, AI Engineer
- Execution Procedure:
- Use JMeter/k6 to apply target Virtual User (VU) and TPS loads, verifying average/P95 response times and DB lock behavior.
- For AI-enabled projects, evaluate 1:1 against the 50-item domain-standard Golden Set to confirm Precision and Recall targets are met.
- Standard Deliverables: EMP-P4-08 Performance Load Test Results Report, EMP-P4-09 AI Golden-Set Quality Evaluation Report
- Acceptance Criteria: Are response time SLAs and AI Golden-Set precision targets achieved?
Action Item A4.5: User Acceptance Testing (UAT) Demonstration & Acceptance Sign-off (Sign-off #3)
- Objective: Obtain official business user validation of production readiness by having client practitioners execute scenarios directly.
- Owner: PO/QA Lead, Client Business Representatives
- Execution Procedure:
- Client business testers directly execute Given-When-Then scenarios in the staging (STG) environment.
- After resolving all critical and major defects to zero, obtain signatures from both parties' leads on the UAT Completion Confirmation.
- Standard Deliverables: EMP-P4-05 System Installation Plan, EMP-P4-11 User Acceptance Testing (UAT) Confirmation
- Acceptance Criteria: Have UAT scenarios passed and has client executive acceptance sign-off (Sign-off #3) been completed?
Action Item A4.6: Third-Party Audit Finding Remediation & Compliance Determination (If Applicable)
- Objective: Secure final "Adequate/Compliant" determination from specialized third-party auditors for public and large-scale projects under Article 57 of the Electronic Government Act.
- Owner: Lead PM, Tech Lead
- Execution Procedure:
- Prepare before/after remediation evidence for every application, DB, and security finding raised by the audit team.
- Undergo auditor re-review and receive final "Remediation Complete (Compliant)" confirmation.
- Standard Deliverables: EMP-P4-10 Third-Party Audit Finding Remediation Report
- Acceptance Criteria: Has the formal remediation-complete compliant determination been received from the audit team?
[Phase 5] Go-Live, Final Acceptance, Settlement & Maintenance (Release & Settlement — 10 Items)
Action Item A5.1: System Transition Plan, Deployment/Rollback Runbook & Data Migration Reconciliation
- Objective: Execute zero-downtime D-Day cutover and verify zero discrepancy in migrated record counts and financial amounts.
- Owner: DevOps Engineer, DBA, PM
- Execution Procedure:
- Execute production deployment following the D-7/D-Day/D+1 Go-Live checklists and emergency rollback runbook.
- Prepare a 100% cross-reconciliation table comparing source DB vs. target DB total record counts and cumulative amounts, and co-sign with the client IT team.
- Standard Deliverables: EMP-P5-01 System Transition Plan, EMP-P5-02 Transition Checklist, EMP-P5-03 Deployment & Rollback Runbook, EMP-P5-04 Data Migration Reconciliation Table
- Acceptance Criteria: Is zero-downtime deployment complete after multi-stage approvals, and is zero data migration discrepancy confirmed?
Action Item A5.2: Runtime Configuration Update & Post-Launch Hypercare Stability Monitoring
- Objective: Detect post-launch anomalies and latency spikes in real time and keep 5xx error rates within thresholds.
- Owner: System Operator, DevOps
- Execution Procedure:
- Apply configuration changes via zero-downtime runtime reload and run intensive APM and log monitoring.
- Upon P1/P2 incidents, activate the escalation flow: notify within 30 minutes -> workaround recovery within 2 hours -> Post-Mortem report within 24 hours.
- Standard Deliverables: EMP-P5-15 Incident Report (Post-Mortem), EMP-P5-16 Monthly Regular Inspection Operations Report
- Acceptance Criteria: Is the 5xx error rate maintained below 0.1% with availability at or above 99.9%?
Action Item A5.3: Pilot Operation & User/Administrator Manual Delivery
- Objective: Validate stability during a 2-week pilot and hand over manuals enabling independent operation by business users and IT admins.
- Owner: Technical Writer, PM, Business Lead
- Execution Procedure:
- Prior to organization-wide launch, evaluate pilot group performance and satisfaction to authorize Grand Open transition.
- Deliver separated manuals for general business users and IT system administrators (Word documents and training PPT decks).
- Standard Deliverables: EMP-P5-05 Pilot Operation Results Report, EMP-P5-06 Consolidated Manual (Word), EMP-P5-07 User Manual Training Deck, EMP-P5-08 Administrator Manual Training Deck
- Acceptance Criteria: Are pilot transition criteria met and have all core feature manuals been delivered?
Action Item A5.4: Client Role-Based Training & Formal Account/Privilege Handover
- Objective: Formally transfer operational privileges and secure documented proof of training delivery.
- Owner: PM, Training Instructor, Client Operations Team
- Execution Procedure:
- Conduct training sessions for business users and IT administrators, and compile attendance sign-in sheets and satisfaction survey results.
- Securely transfer super-admin accounts, SSL certificates, API keys, and the complete deliverable package according to the Handover Plan.
- Standard Deliverables: EMP-P5-09 Training Plan & Results Report, EMP-P5-10 Operations Team Handover Plan
- Acceptance Criteria: Have training attendance sign-in sheets and signed receipt confirmations for accounts and assets been secured?
Action Item A5.5: Operations Runbook Update & One-Click Dev Onboarding Packaging
- Objective: Standardize the environment so post-launch maintenance engineers can spin up local environments and troubleshoot issues on day one.
- Owner: Tech Lead
- Execution Procedure:
- Update the Operations Runbook (covering incident response, backup schedules, and batch reprocessing procedures) and
docker-compose-local.yml. - Verify that a newly onboarded engineer can reproduce local build and execution using only the onboarding guide.
- Update the Operations Runbook (covering incident response, backup schedules, and batch reprocessing procedures) and
- Standard Deliverables: EMP-P5-03 System Deployment & Rollback Runbook, latest
docker-compose-local.ymlandONBOARDING.md - Acceptance Criteria: Can a new engineer execute a local build and health check on day one using documentation alone?
Action Item A5.6: Project Completion Briefing & Final Acceptance Certificate Signing (Sign-off #4)
- Objective: Obtain formal certification of contract fulfillment to establish the legal right to invoice the final balance and fix the revenue recognition date.
- Owner: Lead PM, Business Division Head, Client Representative & Inspection Officer
- Execution Procedure:
- Summarize final execution performance, quality metrics, and the complete deliverables checklist, and conduct the Project Completion Briefing.
- Collect the original Final Acceptance Certificate and System Handover Receipt stamped with the client's corporate seal.
- Standard Deliverables: EMP-P5-11 Project Completion Report, EMP-P5-12 Final Acceptance Certificate & Handover Receipt
- Acceptance Criteria: Has the original Final Acceptance Certificate stamped with the client's official corporate seal been secured?
Action Item A5.7: Final Completion Balance (30%) Billing Notice & Collection
- Objective: Collect the full final balance into the corporate bank account within contractual terms without missing accounting review documents.
- Owner: Business Support/Accounting Team, Account Executive
- Execution Procedure:
- Issue the electronic tax invoice based on the final acceptance date.
- Submit the official payment request notice together with all 7 mandatory supporting documents (acceptance certificate, tax invoice, warranty bond, national tax/local tax/4 major social insurance clearance certificates, bankbook copy) and confirm deposit receipt.
- Standard Deliverables: EMP-P5-13 Final Completion Payment Request Notice, electronic tax invoice, and deposit confirmation receipt
- Acceptance Criteria: Has the full remaining balance been deposited into the corporate bank account without discrepancy within contractual payment terms?
Action Item A5.8: Defect Warranty Performance Bond Issuance & Free Warranty Support Initiation
- Objective: Guarantee fulfillment of the 1-year free defect liability obligation and formalize the defect intake channel.
- Owner: Business Support Team, Maintenance Team
- Execution Procedure:
- Issue a Defect Warranty Performance Bond Insurance Policy (5–10% of contract value) and submit it to the client.
- Guide the client operations team on the free warranty intake/resolution register and work request operating procedures.
- Standard Deliverables: Defect warranty performance bond insurance policy, EMP-P5-17 Maintenance Work Request, EMP-P5-18 Defect Warranty Resolution Register
- Acceptance Criteria: Have bond submission and agreement on the free warranty intake channel been completed?
Action Item A5.9: Maintenance SLA Agreement Proposal & Monthly AI FinOps Settlement Cadence
- Objective: Establish clear boundaries between free warranty (defects) and paid maintenance (feature additions/prompt tuning), and ensure transparent AI operating cost settlement.
- Owner: Account Executive, Maintenance Team, AI Operations Lead
- Execution Procedure:
- Execute a Defect Warranty & Maintenance SLA Agreement specifying SLAs by incident severity (P1–P4) and paid-service transition triggers.
- For AI-enabled projects, submit a monthly AI FinOps report detailing per-model calls, token consumption, cache savings, and departmental chargebacks.
- Standard Deliverables: EMP-P5-14 Defect Warranty & Maintenance SLA Agreement, EMP-P5-19 Monthly AI FinOps Token Settlement Report
- Acceptance Criteria: Are free vs. paid boundaries codified and are monthly operations and FinOps reporting cadences active?
Action Item A5.10: Project Closure Retrospective, Post-Completion Cost Settlement (P&L) & 5-Year Archiving
- Objective: Settle actual P&L against target margin, institutionalize organizational knowledge, and complete statutory 5-year document retention.
- Owner: Lead PM, Development Lead, Business Support Team
- Execution Procedure:
- Close out the Execution Budget (
EMP-P0-05) and Cost Ledger (EMP-P3-07) and report final project Profit & Loss (P&L) to executive leadership. - Archive all contract, acceptance, security, and AI evaluation records in the corporate repository for 5-year retention and publish the project retrospective.
- Close out the Execution Budget (
- Standard Deliverables: EMP-G0-03 Integrated Project Management Master (Closed), EMP-P3-07 Cost Management Ledger (Settled), Project Retrospective
- Acceptance Criteria: Have final P&L reporting, retrospective registration, and 5-year archiving been completed?